Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07736
Well Classification: CBM Status: PR - 4/30/2014
Well Name/No:VPR C #109
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/30/2014
FacilityID:264832LocationID:308258
County:LAS ANIMAS #071Location:SWSE 11 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7740 ft.
Basin:RATON BASIN  
Planned Location:1315FSL  1356 FELLat/Long: 37.008596 / -104.744374Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.008580 / -104.744380Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/30/2014             Measured TD: 2210 ft.    Vertical TD: 2210 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/30/2014
Wellbore Permit
Permit #:20021761 Expiration Date:10/1/2003
Proposed Depth/Form:2350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/1/2003
Spud Date:5/17/2003Spud Date Is:ACTUAL
Measured TD:2210 ft.Measured PB depth:2140 ft.
True Vertical TD:2210 ft.True Vertical PB depth:2140 ft.
Log Types:ARRAY INDUCTION, EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG AFTER FRAC AND MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 260 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2180 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 333, Top: 30 ft., Bottom: 2070 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1713 ft.NN
VERMEJO COAL1713 ft.1938 ft.NN
TRINIDAD1952 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/26/2010                Interval Top: 1713 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/1/2003
Treatment Summary:10/30/03 PUMPED FRACTURE TREATMENT WITH 102220 LBS OF 20/40 OTTAWA/TLC SAND AT 10.9 BPM, AVG PRESSURE AT 709 PSI (STAGE 1-4) -21 HOLES, 1754-1759',1777-1779',1852-1854',1883-1888'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
No Perforation Data was found for formation VRMJ.

Formation RT-VJ                   Formation Classification:  GW                   Status:  CM - 11/9/2003                 Interval Top: 1116 ft.    Interval Bottom: 1888 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:CASING SWAB
Open Hole Completion:No
Formation Treatment
Treatment Date:11/1/2003
Treatment Summary:10/30/03 PUMPED FRACTURE TREATMENT WITH 134930 LBS OF 20/40 OTTAWA/TLC SAND AT 10.9 BPM, AVG PRESSURE AT 709 PSI (STAGE 1-7)-30 HOLES,1116-1118',1569-1571',1594-1596',1754-1759',1777-1779',1852-1854',1883-1888'.
Tubing Size:2.875 in.Tubing Setting Depth:1957 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/9/2003Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 228
CALC_BBLS_H2O 228
CALC_MCF_GAS 0
CASING_PRESS 165
MCF_GAS 0
Perforation Data:
Interval Top:1116 ft.# Of Holes:30
Interval Bottom:1888 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 1116 ft.    Interval Bottom: 1596 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/1/2003
Treatment Summary:10/30/03 PUMPED FRACTURE TREATMENT WITH 32700 LBS OF 20/40 OTTAWA/TLC SAND AT 10.9 BPM, AVG PRESSURE AT 709 PSI (STAGE 5-7) - 9 HOLES, 1116-1118',1569-1571', 1594-1596'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:1116 ft.# Of Holes:9
Interval Bottom:1596 ft.Hole Size:

Formation RTS-VJ                 Formation Classification:  GW                 Status:  PR - 10/26/2010                Interval Top: 884 ft.    Interval Bottom: 1894 ft.

 Completed Information for Formation RATON SAND - VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON SAND - VERMEJO COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/28/2010
Treatment Summary:PERF'D 884'-887', 1046'-1048', 1060'-1063', 1116'-1118', 1152'-1154', 1560'-1572', 1594'-1596', 1757'-1760', 1777'-1779', 1852'-1854', 1885'-1890', 1892'-1894' ACID 1892'-1892', 1885'1890', 1852'-1854' W/550 GALS 15%HCL, 1777'-1779', 1757'-1760' W/350 GALS 15% HCL, 1594'-1596', 1570'-1572' 200 GALS 15% HCL, 1152'-1154', 1116'-1118' W/200 GALS 15% HCL, 1060'-1063',1046'-1048',884'-887' W/600 GALS 15% HCL *30 PREVIOUS HOLES = 40 NEW HOLES = 70 HOLES
Tubing Size:2.875 in.Tubing Setting Depth:1947 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/26/2010Test Method:production
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 40
BTU_GAS 998
CALC_BBLS_H2O 40
CALC_MCF_GAS 16
CASING_PRESS 13
MCF_GAS 16
TUBING_PRESS 160
Perforation Data:
Interval Top:884 ft.# Of Holes:70
Interval Bottom:1894 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)5801
GOR
GOR DeterminationMCFE
Average BOE per Day2.740
Average MCFE per Day15.897

 Federal Financial Assurance  i 

 Tribal Well  i No