|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/30/2014 Measured TD: 2210 ft. Vertical TD: 2210 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/30/2014 | | Wellbore Permit | | | Permit #: | 20021761 | Expiration Date: | 10/1/2003 | | Proposed Depth/Form: | 2350 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/1/2003 | | Spud Date: | 5/17/2003 | Spud Date Is: | ACTUAL | | Measured TD: | 2210 ft. | Measured PB depth: | 2140 ft. | | True Vertical TD: | 2210 ft. | True Vertical PB depth: | 2140 ft. | | Log Types: | ARRAY INDUCTION, EPITHERMAL NEUTRON LITHO DENSITY, CEMENT BOND LOG AFTER FRAC AND MUD LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 260 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2180 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 333, Top: 30 ft., Bottom: 2070 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1713 ft. | N | N | | VERMEJO COAL | 1713 ft. | 1938 ft. | N | N | | TRINIDAD | 1952 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 10/26/2010 Interval Top: 1713 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2003 | | Treatment Summary: | 10/30/03 PUMPED FRACTURE TREATMENT WITH 102220 LBS OF 20/40 OTTAWA/TLC SAND AT 10.9 BPM, AVG PRESSURE AT 709 PSI (STAGE 1-4) -21 HOLES, 1754-1759',1777-1779',1852-1854',1883-1888' |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation VRMJ. |
| | No Perforation Data was found for formation VRMJ. |
|
Formation RT-VJ Formation Classification: GW Status: CM - 11/9/2003 Interval Top: 1116 ft. Interval Bottom: 1888 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | 0.250 in. | | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | | Production Method: | CASING SWAB | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2003 | | Treatment Summary: | 10/30/03 PUMPED FRACTURE TREATMENT WITH 134930 LBS OF 20/40 OTTAWA/TLC SAND AT 10.9 BPM, AVG PRESSURE AT 709 PSI (STAGE 1-7)-30 HOLES,1116-1118',1569-1571',1594-1596',1754-1759',1777-1779',1852-1854',1883-1888'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1957 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/9/2003 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 228 | | CALC_BBLS_H2O | 228 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 165 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 1116 ft. | # Of Holes: | 30 | | Interval Bottom: | 1888 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 4/30/2014 Interval Top: 1116 ft. Interval Bottom: 1596 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 11/1/2003 | | Treatment Summary: | 10/30/03 PUMPED FRACTURE TREATMENT WITH 32700 LBS OF 20/40 OTTAWA/TLC SAND AT 10.9 BPM, AVG PRESSURE AT 709 PSI (STAGE 5-7) - 9 HOLES, 1116-1118',1569-1571', 1594-1596'. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 1116 ft. | # Of Holes: | 9 | | Interval Bottom: | 1596 ft. | Hole Size: | |
|
Formation RTS-VJ Formation Classification: GW Status: PR - 10/26/2010 Interval Top: 884 ft. Interval Bottom: 1894 ft.| Completed Information for Formation RATON SAND - VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON SAND - VERMEJO COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/28/2010 | | Treatment Summary: | PERF'D 884'-887', 1046'-1048', 1060'-1063', 1116'-1118', 1152'-1154', 1560'-1572', 1594'-1596', 1757'-1760', 1777'-1779', 1852'-1854', 1885'-1890', 1892'-1894'
ACID 1892'-1892', 1885'1890', 1852'-1854' W/550 GALS 15%HCL, 1777'-1779', 1757'-1760' W/350 GALS 15% HCL, 1594'-1596', 1570'-1572' 200 GALS 15% HCL, 1152'-1154', 1116'-1118' W/200 GALS 15% HCL, 1060'-1063',1046'-1048',884'-887' W/600 GALS 15% HCL *30 PREVIOUS HOLES = 40 NEW HOLES = 70 HOLES |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1947 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/26/2010 | Test Method: | production | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 40 | | BTU_GAS | 998 | | CALC_BBLS_H2O | 40 | | CALC_MCF_GAS | 16 | | CASING_PRESS | 13 | | MCF_GAS | 16 | | TUBING_PRESS | 160 |
| | Perforation Data: | | Interval Top: | 884 ft. | # Of Holes: | 70 | | Interval Bottom: | 1894 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 5801 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 2.740 |
| Average MCFE per Day | 15.897 |
| Federal Financial Assurance | i | |
|
|