Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07733
Well Classification: GW Status: PR - 10/2/2002
Well Name/No:VPR C #111
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/2/2002
FacilityID:264829LocationID:308255
County:LAS ANIMAS #071Location:NESE 12 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7566 ft.
Basin:RATON BASIN  
Planned Location:1362FSL  1143 FELLat/Long: 37.008666 / -104.725554Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.008650 / -104.725560Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/20/2002             Measured TD: 2000 ft.    Vertical TD: 2000 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/20/2002
Wellbore Permit
Permit #:20021759 Expiration Date:10/1/2003
Proposed Depth/Form:2150 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/11/2003
Spud Date:4/9/2003Spud Date Is:ACTUAL
Measured TD:2000 ft.Measured PB depth:1956 ft.
True Vertical TD:2000 ft.True Vertical PB depth:1956 ft.
Log Types:AI, ENLD, CBL, AFTER FRAC AND MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 260 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 260 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1984 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 269, Top: 1200 ft., Bottom: 1947 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 1984 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 166, Top: 68 ft., Bottom: 1200 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1532 ft.NN
VERMEJO COAL1532 ft.1760 ft.NN
TRINIDAD1773 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/26/2003                 Interval Top: 846 ft.    Interval Bottom: 1760 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.266 in.
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:6/11/2003
Treatment Summary:06/08/03 PUMPED FRACTURE TREATMENT & 131,390 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 8.2 BPM.(STAGE 1 TRHU STAGE 6) THRU 44 HOLES; 846'-848', 850'-852',918'-920', 1441' - 1444', 1612'-1614', 1710'-1714', 1758'-1700'
Tubing Size:2.875 in.Tubing Setting Depth:1886 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/26/2003Test Method:PUMPING FLOW
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 186
CALC_BBLS_H2O 186
CALC_MCF_GAS 0
CASING_PRESS 10
MCF_GAS 0
Perforation Data:
Interval Top:846 ft.# Of Holes:44
Interval Bottom:1760 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)3029
GOR
GOR DeterminationMCFE
Average BOE per Day1.426
Average MCFE per Day8.291

 Federal Financial Assurance  i 

 Tribal Well  i No