Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07731
Well Classification: CBM Status: PR - 5/1/2025
Well Name/No:VPR C #112
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/1/2025
FacilityID:264828LocationID:308253
County:LAS ANIMAS #071Location:NENE 11 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7448 ft.
Planned Location:1136FNL  377 FELLat/Long: 37.016305 / -104.741024Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.016290 / -104.741030Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/1/2025             Measured TD: 1910 ft.    Vertical TD: 1910 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/1/2025
Wellbore Permit
Permit #:20021758 Expiration Date:10/1/2003
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/4/2003
Spud Date:5/16/2003Spud Date Is:ACTUAL
Measured TD:1910 ft.Measured PB depth:1857 ft.
True Vertical TD:1910 ft.True Vertical PB depth:1857 ft.
Log Types:ARRAY INDUCTION,EPITHERMAL NEUTRON LITHO DENSITY,CEMENT BOND LOG AFTER FRAC AND MUD LOG.
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 257 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 257 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1880 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 261, Top: 0 ft., Bottom: 1861 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1387 ft.NN
VERMEJO COAL1387 ft.1621 ft.NN
TRINIDAD1666 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 11/14/2003                Interval Top: 1472 ft.    Interval Bottom: 1572 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2003
Treatment Summary:10/31/03 PUMPED FRAC TREATMENT & 71,900 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 11.8 BPM. (STAGE 1 AND 2) THRU 9 HOLES:1472-1476', 1570-1572'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation VRMJ.
Perforation Data:
Interval Top:1472 ft.# Of Holes:9
Interval Bottom:1572 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/1/2025                  Interval Top: 873 ft.    Interval Bottom: 1572 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.266 in.
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:PUMPING CBM GAS WELL. PRODUCED WATER INJ IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2003
Treatment Summary:10/31/03 PUMPED FRAC TREATMENT & 115,300 LBS 20/40 OTTAWA/TEMP LC PROPP SAND AT 11.8 BPM. (STAGE 1 AND 4) THRU 15 HOLES: 873-875', 1278-1280', 1472-1476'. 1570-1572'.
Tubing Size:2.875 in.Tubing Setting Depth:1629 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2003Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
CALC_BBLS_H2O 0
CALC_MCF_GAS 0
CASING_PRESS 70
MCF_GAS 0
Perforation Data:
Interval Top:873 ft.# Of Holes:15
Interval Bottom:1572 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 873 ft.    Interval Bottom: 1280 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:11/4/2003
Treatment Summary:10/31/03 PUMPED FRACTURE TREATMENT AND 43,400 LBS OF 20/40 OTTAWA/TEMP LC PROPP SAND AT 11.8 BPM.(STAGE 3 & 4) THRU 6 HOLES:873-875', 1278-1280'.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:873 ft.# Of Holes:6
Interval Bottom:1280 ft.Hole Size:
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
04/2024 - 03/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)107
GOR
GOR DeterminationMCFE
Average BOE per Day0.054
Average MCFE per Day0.302

 Federal Financial Assurance  i 

 Tribal Well  i No