Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07659
Well Classification: CBM Status: PR - 11/18/2002
Well Name/No:VPR C #92
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/18/2002
FacilityID:264062LocationID:308200
County:LAS ANIMAS #071Location:NWSE 2 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7636 ft.
Basin:RATON BASIN  
Planned Location:1470FSL  2081 FELLat/Long: 37.023455 / -104.746855Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.023440 / -104.746860Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 11/18/2002             Measured TD: 2095 ft.    Vertical TD: 2095 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 11/18/2002
Wellbore Permit
Permit #:20021063 Expiration Date:6/23/2003
Proposed Depth/Form:2250 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/2/2002
Spud Date:10/6/2002Spud Date Is:ACTUAL
Measured TD:2095 ft.Measured PB depth:2070 ft.
True Vertical TD:2095 ft.True Vertical PB depth:2070 ft.
Top PZ Location:Sec: Twp: Footage:  FL   FL
Bottom Hole Location:Sec: Twp: Footage:  FL   FL
Log Types:ARRAY IND.,EPITHERMAL NEU LITHO DEN.,CBL AND MUD LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 245 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 85, Top: 0 ft., Bottom: 245 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2080 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 2080 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1590 ft.NN
VERMEJO COAL1590 ft.1845 ft.NN
TRINIDAD1862 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/18/2002                Interval Top: 1465 ft.    Interval Bottom: 1806 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW.
Open Hole Completion:No
Formation Treatment
Treatment Date:11/2/2002
Treatment Summary:10/28/02 PUMPED 14.4 BBLS 15% NEFE ACID, LINEAR GEL, TREATED WATER, AND 120,690 LBS OF 16/30 MESH SAND AT 9.5 BPM (STAGE 1 THRU STAGE 3) THRU 23 HOLES 11465' - 1806'.
Tubing Size:2.875 in.Tubing Setting Depth:1863 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/18/2002Test Method:PUMPING FLOW
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 97
CALC_BBLS_H2O 97
MCF_GAS 0
Perforation Data:
Interval Top:1465 ft.# Of Holes:23
Interval Bottom:1806 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)8135
GOR
GOR DeterminationMCFE
Average BOE per Day3.848
Average MCFE per Day22.297

 Federal Financial Assurance  i 

 Tribal Well  i No