Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07568
Well Classification: CBM Status: PR - 6/11/2012
Well Name/No:HILL RANCH #18-01V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/11/2012
FacilityID:262627LocationID:308131
County:LAS ANIMAS #071Location:NENE 18 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8614 ft.
Basin:RATON BASIN  
Planned Location:601FNL  884 FELLat/Long: 37.002895 / -104.923250Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.002910 / -104.923210Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/5/2012
End Date: 6/5/2012
Reported: 7/2/2012
Days to report: 27
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/11/2012             Measured TD: 2920 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/11/2012
Wellbore Permit
Permit #:20020150 Expiration Date:2/4/2003
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:4/16/2002
Spud Date:3/5/2002Spud Date Is:ACTUAL
Measured TD:2920 ft.Measured PB depth:2825 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 697 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 190, Top: 0 ft., Bottom: 697 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2846 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 980 ft., Bottom: 2846 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 90, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2495 ft.NN
VERMEJO COAL2495 ft.2790 ft.NN
TRINIDAD2790 ft.2880 ft.NN
PIERRE2880 ft.2920 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 7/16/2012                 Interval Top: 2500 ft.    Interval Bottom: 2738 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:4/19/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:10/3/2012Treatment End Date:N/A
Treatment Summary:Status Change Only
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/16/2002
Treatment Summary:DELTA FRAC PERFORATIONS: 2711'-16', 2734'-38' (4 SPF. 40 HOLES) FRAC 1ST STAGE: 35,326 20# GEL, 49,000# 16/30 , N2 N/A, 50 GAL. HCL PERFORATIONS: 2653'-58', 2661'-64' (4 SPF. 32 HOLES) FRAC 2ND STAGE: 26, 441 20# GEL, 35,000# 16/30, N2 N/A, 50 GAL. HCL PERFORATIONS: 2564'-67', 2573'-76' (4 SPF. 24 HOLES) FRAC 3RD STAGE: 26,441 20# GEL, 35,000# 16/30, N2 N/A, 50 GAL HCL PERFORATIONS: 2500'-04' (4 SPF. 16 HOLES) FRAC 4TH STAGE: 26,441 20# GEL, 35,000# 16/30, N2 N/A, 50 GAL HCL
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 142
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 142
CALC_MCF_GAS 82
CASING_PRESS 25
MCF_GAS 82
Perforation Data:
Interval Top:2500 ft.# Of Holes:112
Interval Bottom:2738 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/11/2012                 Interval Top: 818 ft.    Interval Bottom: 2738 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/19/2012Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:
Tubing Size:2.875 in.Tubing Setting Depth:2794 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/11/2012Test Method:FLowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1001
CALC_BBLS_H2O 78
CALC_MCF_GAS 86
CASING_PRESS 65
GRAVITY_OIL 1
TUBING_PRESS 30
Perforation Data:
Interval Top:818 ft.# Of Holes:169
Interval Bottom:2738 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/3/2012                 Interval Top: 818 ft.    Interval Bottom: 1770 ft.

 Completed Information for Formation RATON COAL
1st Production Date:6/19/2012Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/4/2012Treatment End Date:6/5/2012
Treatment Summary:Acidized w/2500 gals 15% HCl acid. Frac'd w/166,991 gals 20# Delta 140 w/sandwedge OS carrying 299,343# 16/30 Brady sand.
Total fluid used in treatment (bbls):3976Max pressure during treatment (psi):2379
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:2
Total acid used in treatment (bbls):60Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):3977Total flowback volume recovered (bbls):12195
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):299343Green completions techniques utilized:No
Reason green techniques Not utilized: PRESSURE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:818 ft.# Of Holes:57
Interval Bottom:1770 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)18669
GOR
GOR DeterminationMCFE
Average BOE per Day8.818
Average MCFE per Day51.126

 Federal Financial Assurance  i 

 Tribal Well  i No