|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/1/2024 Measured TD: 2448 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/1/2024 | | Wellbore Permit | | | Permit #: | 20020129 | Expiration Date: | 1/23/2003 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | STATE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/11/2002 | | Spud Date: | 2/15/2002 | Spud Date Is: | ACTUAL | | Measured TD: | 2448 ft. | Measured PB depth: | 2446 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 545 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: 545 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2445 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 370, Top: 210 ft., Bottom: 2445 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2072 ft. | N | N | | VERMEJO COAL | 2072 ft. | 2390 ft. | N | N | | TRINIDAD | 2390 ft. | 2480 ft. | N | N | | PIERRE | 2480 ft. | 2515 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/24/2002 Interval Top: 2108 ft. Interval Bottom: 2374 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 3/24/2002 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | 30NO45 PC PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/11/2002 | | Treatment Summary: | SEE SCANNED DOC# 1336307 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2391 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/24/2002 | Test Method: | | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 65 | | CALC_BBLS_H2O | 65 | | CALC_MCF_GAS | 5 | | MCF_GAS | 5 |
| | Perforation Data: | | Interval Top: | 2108 ft. | # Of Holes: | 160 | | Interval Bottom: | 2374 ft. | Hole Size: | 4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 6/25/2006 Interval Top: 923 ft. Interval Bottom: 1248 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 6/24/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 6/9/2006 | | Treatment Summary: | ACIDIZED W/1600 GALS 15% HCL ACID. FRAC'D W/178,774 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 13,700# 16/30 AND 233,031# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1340 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/25/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 42 | | BBLS_OIL | 0 | | BTU_GAS | 1089.7 | | CALC_BBLS_H2O | 42 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | GRAVITY_OIL | 0.632 | | MCF_GAS | 0 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 923 ft. | # Of Holes: | 60 | | Interval Bottom: | 1248 ft. | Hole Size: | 0.41 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 4/1/2024| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 6/24/2006 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 14380 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.789 |
| Average MCFE per Day | 39.383 |
| Federal Financial Assurance | i | |
|
|