|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 11/16/2007 Measured TD: 2125 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 11/16/2007 | Wellbore Permit | | Permit #: | 20020128 | Expiration Date: | 1/23/2003 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/27/2002 | Spud Date: | 2/25/2002 | Spud Date Is: | ACTUAL | Measured TD: | 2125 ft. | Measured PB depth: | 2126 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDL, SIL, CBL (2) | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 60, Top: 0 ft., Bottom: 212 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2110 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 1100 ft., Bottom: 2110 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 134, Top: 0 ft., Bottom: 1100 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1660 ft. | N | N | VERMEJO COAL | 1660 ft. | 1980 ft. | N | N | TRINIDAD | 1980 ft. | 2090 ft. | N | N | PIERRE | 2090 ft. | 2125 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 11/16/2007 Interval Top: 1669 ft. Interval Bottom: 1970 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 3/27/2002 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/25/2002 | Treatment Summary: | FRAC'D W/99,241 BBLS FRAC FLUID, 65,096 SLF AND 167,630# 16/30 BRADY SAND. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1991 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 27 | BBLS_OIL | 0 | BTU_GAS | 998 | CALC_BBLS_H2O | 27 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 3 | CASING_PRESS | 0 | MCF_GAS | 3 |
| Perforation Data: | Interval Top: | 1669 ft. | # Of Holes: | 140 | Interval Bottom: | 1970 ft. | Hole Size: | 4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 8/19/2007 Interval Top: 432 ft. Interval Bottom: 894 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 8/10/2007 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 8/1/2007 | Treatment Summary: | ACIDIZED W/2000 GALS 15% HCL ACID. FRAC'D W/82,338 GALS 20# DELTA 140 FRAC FLUID W/SANDWEDGE OS CARRYING 8314# 16/30 BRADY SAND AND 140,400# 12/20 BRADY SAND. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2003 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 8/19/2007 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 6 | BBLS_OIL | 0 | BTU_GAS | 1006 | CALC_BBLS_H2O | 6 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 5 | CASING_PRESS | 4 | GRAVITY_OIL | 1 | MCF_GAS | 5 | TUBING_PRESS | 4 |
| Perforation Data: | Interval Top: | 432 ft. | # Of Holes: | 59 | Interval Bottom: | 894 ft. | Hole Size: | 0.45 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 11/16/2007 Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 8/10/2007 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 23847 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 11.269 |
Average MCFE per Day | 65.348 |
Federal Financial Assurance | i | |
|
|