Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07442
Well Classification: CBM Status: PR - 3/1/2022
Well Name/No:APACHE CANYON #17-07V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2022
FacilityID:260463LocationID:308046
County:LAS ANIMAS #071Location:SWNE 17 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7823 ft.
Basin:RATON BASIN  
Planned Location:2047FNL  1592 FELLat/Long: 37.085893 / -104.907650Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.085900 / -104.907680Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/1/2022             Measured TD: 2275 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/1/2022
Wellbore Permit
Permit #:011206 Expiration Date:6/19/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/19/2001
Spud Date:7/24/2001Spud Date Is:ACTUAL
Measured TD:2275 ft.Measured PB depth:2273 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 664 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 180, Top: 0 ft., Bottom: 664 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2260 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 92 ft., Bottom: 2260 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1780 ft.NN
VERMEJO COAL1780 ft.2137 ft.NN
TRINIDAD2137 ft.2275 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/20/2006                 Interval Top: 1788 ft.    Interval Bottom: 2062 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/10/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/27/2006
Treatment Summary:ACIDIZED W/1100 GALS 15% HCL ACID. FRAC'D W/102,621 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 12,500 16/30 & 163,174# 12/20 SAND.
Tubing Size:2.875 in.Tubing Setting Depth:2158 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/20/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 55
BBLS_OIL 0
BTU_GAS 993
CALC_BBLS_H2O 55
CALC_MCF_GAS 31
CASING_PRESS 0
GRAVITY_OIL 1
MCF_GAS 31
TUBING_PRESS 6
Perforation Data:
Interval Top:1788 ft.# Of Holes:30
Interval Bottom:2062 ft.Hole Size:0.46 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 3/1/2022                  Interval Top: 674 ft.    Interval Bottom: 2062 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/23/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2125 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 86
BTU_GAS 1007
CALC_BBLS_H2O 86
CALC_MCF_GAS 91
CASING_PRESS 17
MCF_GAS 91
TUBING_PRESS 3
Perforation Data:
Interval Top:674 ft.# Of Holes:161
Interval Bottom:2062 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 674 ft.    Interval Bottom: 1060 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/23/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/15/2010
Treatment Summary:Acidized w/2,200 gals 15% HCl acid. Frac'd w/133,679 gals 20# Delta 140 w/Sandwedge OS carrying 18,293# 16/30 Brady sd & 286,730# 12/20 Brady sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:674 ft.# Of Holes:63
Interval Bottom:1060 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17132
GOR
GOR DeterminationMCFE
Average BOE per Day8.076
Average MCFE per Day46.853

 Federal Financial Assurance  i 

 Tribal Well  i No