Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07426
Well Classification: CBM Status: PR - 6/26/2011
Well Name/No:HILL RANCH #09-02V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/26/2011
FacilityID:260406LocationID:308039
County:LAS ANIMAS #071Location:NWNE 9 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8126 ft.
Basin:RATON BASIN  
Planned Location:413FNL  2442 FELLat/Long: 37.017885 / -104.892429Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.017840 / -104.892450Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/6/2011
End Date: 6/6/2011
Reported: 4/16/2012
Prior to rule 205A.b.(2)(A)
Days to report: 315
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 6/26/2011             Measured TD: 2545 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 6/26/2011
Wellbore Permit
Permit #:20011165 Expiration Date:6/17/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:7/29/2001Spud Date Is:ACTUAL
Measured TD:2545 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/NEUTRON , SINGLE INDUCTION
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 579 ft., Weight: 23# , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 579 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2505 ft., Weight: 15.5# , Citings Type: ACTUAL
Cement:Sacks: 335, Top: 0 ft., Bottom: 2505 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2100 ft.NN
VERMEJO COAL2100 ft.2377 ft.NN
TRINIDAD2377 ft.2545 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 12/1/2010                 Interval Top: 2109 ft.    Interval Bottom: 2356 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/18/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:10/18/2001
Treatment Summary:25,400# 16/30 SAND & 183 BBLS FLUID.
Tubing Size:2.875 in.Tubing Setting Depth:2382 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/23/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 204
BBLS_OIL 0
CALC_BBLS_H2O 204
CALC_BBLS_OIL 0
CALC_MCF_GAS 193
CASING_PRESS 36
MCF_GAS 193
Perforation Data:
Interval Top:2109 ft.# Of Holes:88
Interval Bottom:2356 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 6/26/2011                 Interval Top: 721 ft.    Interval Bottom: 2356 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:6/25/2011Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2413 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/26/2011Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 123
BTU_GAS 1006
CALC_BBLS_H2O 123
CALC_MCF_GAS 20
CASING_PRESS 52
MCF_GAS 20
TUBING_PRESS 5
Perforation Data:
Interval Top:721 ft.# Of Holes:154
Interval Bottom:2356 ft.Hole Size:0.51 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 7/18/2011                 Interval Top: 721 ft.    Interval Bottom: 1904 ft.

 Completed Information for Formation RATON COAL
1st Production Date:6/25/2011Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/7/2011
Treatment Summary:Acidized w/3,000 gals 15% HCl acid. Frac'd w/152,730 gals 20# Delta 140 w/Sandwedge OS carrying 386,092# 16/30 Nebraska sd.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:721 ft.# Of Holes:66
Interval Bottom:1904 ft.Hole Size:0.42 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
July 2024 - June 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)20839
GOR
GOR DeterminationMCFE
Average BOE per Day9.840
Average MCFE per Day57.088

 Federal Financial Assurance  i 

 Tribal Well  i No