Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07425
Well Classification: CBM Status: PR - 7/22/2010
Well Name/No:HILL RANCH #03-15V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/22/2010
FacilityID:260403LocationID:308038
County:LAS ANIMAS #071Location:SWSE 3 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8055 ft.
Planned Location:54FSL  2538 FELLat/Long: 37.019145 / -104.874688Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.019150 / -104.874740Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/22/2010             Measured TD: 2545 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/22/2010
Wellbore Permit
Permit #:20011146 Expiration Date:6/14/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/12/2001
Spud Date:8/3/2001Spud Date Is:ACTUAL
Measured TD:2545 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:COMP.DENSITY/NEUTRON, SINGLE INDUCTION
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 212 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2505 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 2505 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2090 ft.NN
VERMEJO COAL2090 ft.2380 ft.NN
TRINIDAD2380 ft.2545 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 10/15/2001                Interval Top: 2099 ft.    Interval Bottom: 2364 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:10/12/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:10/15/2001
Treatment Summary:64,000# 16/30 SAND & 414 BBLS FLUID. // 16,300# 16/30 SAND & 116 BBLS FLUID. // 15,900# 16/30 SAND & 108 BBLS FLUID. // 15,500# 16/30 SAND & 143 BBLS FLUID. // 16,200# 16/30 SAND & 119 BBLS FLUID. // 24,300# 16/30 SAND & 167 BBLS FLUID
Tubing Size:2.875 in.Tubing Setting Depth:2393 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/15/2001Test Method:PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 170
BBLS_OIL 0
CALC_BBLS_H2O 170
CALC_BBLS_OIL 0
CALC_MCF_GAS 112
CASING_PRESS 31
MCF_GAS 112
Perforation Data:
Interval Top:2099 ft.# Of Holes:112
Interval Bottom:2364 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 7/22/2010                 Interval Top: 725 ft.    Interval Bottom: 2364 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/21/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.875 in.Tubing Setting Depth:2391 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/22/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 108
BTU_GAS 1003
CALC_BBLS_H2O 108
CALC_MCF_GAS 96
CASING_PRESS 2
MCF_GAS 96
TUBING_PRESS 3
Perforation Data:
Interval Top:725 ft.# Of Holes:180
Interval Bottom:2364 ft.Hole Size:0.51 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 725 ft.    Interval Bottom: 1592 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/21/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/13/2010
Treatment Summary:Acidized w/3,400 gals 15% HCl acid. Frac'd w/184,815 gals 20# Delta 140 w/Sandwedge OS carrying 27,685# 16/30 Brady sd & 384,048# 12/20 Brady sd (18,200# 12/20 coated w/Expedite 155).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:725 ft.# Of Holes:68
Interval Bottom:1592 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)32554
GOR
GOR DeterminationMCFE
Average BOE per Day15.570
Average MCFE per Day90.325

 Federal Financial Assurance  i 

 Tribal Well  i No