|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 2/7/2018 Measured TD: 2455 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 2/7/2018 | Wellbore Permit | | Permit #: | 20011064 | Expiration Date: | 5/28/2002 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | STATE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/15/2002 | Spud Date: | 2/17/2002 | Spud Date Is: | ACTUAL | Measured TD: | 2455 ft. | Measured PB depth: | 2453 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDL, SIL, CBL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 694 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 205, Top: 0 ft., Bottom: 694 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2411 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 345, Top: 0 ft., Bottom: 2411 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 2009 ft. | N | N | VERMEJO COAL | 2009 ft. | 2304 ft. | N | N | TRINIDAD | 2304 ft. | 2434 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/20/2002 Interval Top: 1945 ft. Interval Bottom: 2228 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 3/20/2002 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | | Production Method: | 30NO95 PC PUMP | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 3/15/2002 | Treatment Summary: | SEE SCANNED DOC# 1336286 |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2250 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/20/2002 | Test Method: | | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 25 | BBLS_OIL | 0 | CALC_BBLS_H2O | 25 | CALC_MCF_GAS | 47 | MCF_GAS | 47 |
| Perforation Data: | Interval Top: | 1945 ft. | # Of Holes: | 176 | Interval Bottom: | 2228 ft. | Hole Size: | 4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 2/18/2011 Interval Top: 800 ft. Interval Bottom: 1055 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 7/27/2010 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 7/16/2010 | Treatment Summary: | Acidized w/2,200 gals 15% HCl acid. Frac'd w/136,577 gals 20# Delta 140 carrying 15,309# 16/30 Brady sd & 317,859# 12/20 Brady sd (157,200# 12/20 Brady sd coated w/Expedite 155). |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RTON. |
| Perforation Data: | Interval Top: | 800 ft. | # Of Holes: | 44 | Interval Bottom: | 1055 ft. | Hole Size: | 0.45 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 2/7/2018 Interval Top: 799 ft. Interval Bottom: 2230 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 7/27/2010 | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 1/4/2018 | Treatment End Date: | 1/4/2018 | Treatment Summary: | Perforated three Vermejo Coal intervals listed by stage with 4 SPF and 120 degree phasing and fraced the three Vermejo Coal intervals including Stage 1 - 2,190' - 98', 2,210' - 12' and 2,222' - 30', Stage 2 - 2,002' - 07', 2,020' - 22', 2,025' - 29' and 2,033' - 36', Stage 3 - 1,944' -46', 1,952' - 54', 1,960' - 68' and 1,970' - 78' (net - 52' or 208 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 500 gallons of 15% HCl, 127,003 gallons produced water, 159,474 lbs of 20/40 mesh Premium White Sand and 1,024,978 scf N2 were pumped. Stage 2 screened out when 2.0 ppg sand concentration downhole hit the perforations.
Perforated two Raton Coal intervals including Stage 4 - 893' - 00' and Stage 5 - 799' - 01', 804' - 807', 822' - 24' and 829' - 834' (net - 19' or 76 holes) with Coil Tubing Unit, 2-7/8" coiled tubing to isolate stages and a 70/30 Quality foam frac. A total of 400 gallons of 15% HCl, 92,043 gallons of produced water, 129,252 lbs of 20/40 mesh Premium White Sand and 471,773 scf N@ were pumped.
The CTU was rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton - Vermejo well. | Total fluid used in treatment (bbls): | 5233 | Max pressure during treatment (psi): | 3678 | Total gas used in treatment (mcf): | 1496751 | Fluid density (lbs/gal): | 8.35 | Type Of gas: | NITROGEN | Number Of staged intervals: | 5 | Total acid used in treatment (bbls): | 21 | Min frac gradient (psi/ft): | 0.52 | Recycled water used in treatment (bbls): | 5212 | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 288726 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2253 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/22/2018 | Test Method: | Pumping | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 8 | BTU_GAS | 933 | CALC_BBLS_H2O | 8 | CALC_MCF_GAS | 40 | MCF_GAS | 40 | TUBING_PRESS | 4 |
| Perforation Data: | Interval Top: | 799 ft. | # Of Holes: | 284 | Interval Bottom: | 2230 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 21607 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 10.202 |
Average MCFE per Day | 59.193 |
Federal Financial Assurance | i | |
|
|