Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07417
Well Classification: CBM Status: PR - 8/19/2010
Well Name/No:APACHE CANYON #11-07V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/19/2010
FacilityID:260252LocationID:308034
County:LAS ANIMAS #071Location:SWNE 11 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8621 ft.
Basin:RATON BASIN  
Planned Location:1426FNL  1533 FELLat/Long: 37.102033 / -104.961042Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.101970 / -104.961040Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/19/2010             Measured TD: 2422 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/19/2010
Wellbore Permit
Permit #:20011063 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/21/2002
Spud Date:2/19/2002Spud Date Is:ACTUAL
Measured TD:2422 ft.Measured PB depth:2420 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 722 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 722 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2407 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 370, Top: 0 ft., Bottom: 2407 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1969 ft.NN
VERMEJO COAL1969 ft.2303 ft.NN
TRINIDAD2303 ft.2385 ft.NN
PIERRE2385 ft.2425 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 9/8/2010                  Interval Top: 2018 ft.    Interval Bottom: 2307 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/23/2002Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2010
Treatment Summary:Acidized w/ 1,000 gals 15% HCl acid.
Formation Treatment
Treatment Date:3/21/2002
Treatment Summary:SEE SCANNED DOC# 1336274
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 30
BBLS_OIL 0
CALC_BBLS_H2O 30
CALC_MCF_GAS 10
MCF_GAS 10
Perforation Data:
Interval Top:2018 ft.# Of Holes:196
Interval Bottom:2307 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/19/2010                 Interval Top: 817 ft.    Interval Bottom: 2307 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/17/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:2.375 in.Tubing Setting Depth:2373 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/19/2010Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 6
BTU_GAS 1003
CALC_BBLS_H2O 6
CALC_MCF_GAS 44
MCF_GAS 44
TUBING_PRESS 54
Perforation Data:
Interval Top:817 ft.# Of Holes:284
Interval Bottom:2307 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 2/18/2011                 Interval Top: 817 ft.    Interval Bottom: 1103 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/17/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:7/28/2010
Treatment Summary:Acidized w/3,000 gals 15% HCl acid. Frac'd w/176,603 gals 20# Delta 140 carrying 26,400# 16/30 Brady sd & 371,900# 12/20 Brady sd (391,800# sd coated w/Sandwedge OS).
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:817 ft.# Of Holes:88
Interval Bottom:1103 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)27045
GOR
GOR DeterminationMCFE
Average BOE per Day12.778
Average MCFE per Day74.094

 Federal Financial Assurance  i 

 Tribal Well  i No