Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07408
Well Classification: GW Status: SI - 10/1/2017
Well Name/No:APACHE CANYON #02-16V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2017
FacilityID:260242LocationID:308026
County:LAS ANIMAS #071Location:SWSE 2 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8395 ft.
Planned Location:1098FSL  1354 FELLat/Long: 37.108973 / -104.960662Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.109020 / -104.960560Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2017             Measured TD: 2298 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2017
Wellbore Permit
Permit #:20011054 Expiration Date:5/28/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/5/2002
Spud Date:2/7/2002Spud Date Is:ACTUAL
Measured TD:2298 ft.Measured PB depth:2296 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 789 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 789 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2287 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 262, Top: 250 ft., Bottom: 2287 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1776 ft.NN
VERMEJO COAL1776 ft.2150 ft.NN
TRINIDAD2150 ft.2255 ft.NN
PIERRE2255 ft.2290 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  SI - 1/1/2015                  Interval Top: 1788 ft.    Interval Bottom: 2131 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:1/21/2005Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/11/2005
Treatment Summary:Original 2002 Vermejo Perfs 1816'-2131' (132 holes). New 2005 Vermejo Perfs 1788'-2129' (36 holes). 2005 Frac Treatment: Acidized 1788'-2129' perfs w/100 gals 15% HCl acid and frac'd w/108,396 gals 20# Delta 140 w/sandwedge NT carrying 39,800# 16/30 & 137,900# 12/20 Brady sand. 2005 Frac is not broken down due to it being completed prior to the 2012 Frac Ruling.
Formation Treatment
Treatment Date:3/5/2002
Treatment Summary:SEE SCANNED DOC# 1336298
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 25
BBLS_OIL 0
CALC_BBLS_H2O 25
CALC_MCF_GAS 2
MCF_GAS 2
Perforation Data:
Interval Top:1788 ft.# Of Holes:168
Interval Bottom:2131 ft.Hole Size:4 in.
Primary Well Designation:
Out Of Service      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
10/31/2014
Low ProducingYProduction Period
04/2024 - 03/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR DeterminationMCFE
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No