Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07404
Well Classification: CBM Status: PR - 4/19/2010
Well Name/No:APACHE CANYON #07-14V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/19/2010
FacilityID:260234LocationID:308022
County:LAS ANIMAS #071Location:SESW 7 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8068 ft.
Basin:RATON BASIN  
Planned Location:1154FSL  1267 FWLLat/Long: 37.094763 / -104.933351Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.094660 / -104.933400Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/19/2010             Measured TD: 2422 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/19/2010
Wellbore Permit
Permit #:20011047 Expiration Date:5/27/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:STATE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:9/20/2001
Spud Date:7/21/2001Spud Date Is:ACTUAL
Measured TD:2422 ft.Measured PB depth:2419 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 455 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 0 ft., Bottom: 455 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2380 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 1446 ft., Bottom: 2380 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1911 ft.NN
VERMEJO COAL1911 ft.2282 ft.NN
TRINIDAD2282 ft.2425 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 2/14/2003                 Interval Top: 1982 ft.    Interval Bottom: 2223 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:9/21/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:30H200 PC PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:9/20/2001
Treatment Summary:SEE SCANNED DOC# 1336304
Tubing Size:2.875 in.Tubing Setting Depth:2268 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/2001Test Method:
Hours Tested:Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 229
CALC_BBLS_H2O 229
Perforation Data:
Interval Top:1982 ft.# Of Holes:72
Interval Bottom:2223 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 4/19/2010                 Interval Top: 539 ft.    Interval Bottom: 2223 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/18/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2010
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2268 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/19/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 111
BTU_GAS 1009
CALC_BBLS_H2O 111
CASING_PRESS 5
TUBING_PRESS 5
Perforation Data:
Interval Top:539 ft.# Of Holes:179
Interval Bottom:2223 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/19/2010                 Interval Top: 539 ft.    Interval Bottom: 1155 ft.

 Completed Information for Formation RATON COAL
1st Production Date:4/18/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/17/2010
Treatment Summary:ACIDIZED WITH 4000 GALS 15 HCL ACID. FRACD WITH 252386 GALS 20# DELTA 140 WITH SANDWEDGE OS CARRYING 30302 # 16/30 BRADY SD AND 484300# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:539 ft.# Of Holes:107
Interval Bottom:1155 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)16450
GOR
GOR DeterminationMCFE
Average BOE per Day7.781
Average MCFE per Day45.101

 Federal Financial Assurance  i 

 Tribal Well  i No