|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 12/11/2001 Measured TD: 2080 ft. Vertical TD: 2080 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 12/11/2001 | Wellbore Permit | | Permit #: | 20011014 | Expiration Date: | 5/21/2002 | Proposed Depth/Form: | 2230 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 11/15/2001 | Spud Date: | 10/14/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2080 ft. | Measured PB depth: | 2026 ft. | True Vertical TD: | 2080 ft. | True Vertical PB depth: | 2026 ft. | Log Types: | ARRAY INDUCTION,ENLD, CBL AND MUD LOG | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 230 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 75, Top: 0 ft., Bottom: 230 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2048 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 247, Top: 0 ft., Bottom: 2021 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1417 ft. | N | N | VERMEJO COAL | 1534 ft. | 1835 ft. | N | N | TRINIDAD | 1838 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 12/11/2001 Interval Top: 966 ft. Interval Bottom: 1828 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | 12/11/2001 | Choke Size: | 0.250 in. | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | PUMPING CBM GAS WELL. PRODUCED WATER INJECTED IN WDW. | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 11/15/2001 | Treatment Summary: | 11-05-01 PUMPED 800 GALS OF 7.5% HCL ACID, 48 BIO BALLS, 1170,500 SCF N2 WITH 204,560 LBS OF 16/30 MESH SAND AT 16 BPM ( STAGE 1 THRU STAGE 6 ) THRU 96 HOLES 966' - 1828', |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1890 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 12/11/2001 | Test Method: | PUMPING FLOW | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 57 | CALC_BBLS_H2O | 57 | CALC_MCF_GAS | 12 | CASING_PRESS | 35 | MCF_GAS | 12 |
| Perforation Data: | Interval Top: | 966 ft. | # Of Holes: | 96 | Interval Bottom: | 1828 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 38800 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 18.332 |
Average MCFE per Day | 106.318 |
Federal Financial Assurance | i | |
|
|