|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/5/2006 Measured TD: 2425 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/5/2006 | | Wellbore Permit | | | Permit #: | 20010900 | Expiration Date: | 5/7/2002 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 11/18/2001 | | Spud Date: | 6/16/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2425 ft. | Measured PB depth: | 2377 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 392 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 110, Top: 0 ft., Bottom: 392 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2389 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 30 ft., Bottom: 2389 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1954 ft. | N | N | | VERMEJO COAL | 1954 ft. | 2262 ft. | N | N | | TRINIDAD | 2262 ft. | 2425 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 5/1/2006 Interval Top: 1956 ft. Interval Bottom: 2254 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 12/6/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | PUMPING (30NO095-PC) | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 11/18/2001 | | Treatment Summary: | SLICKWATER COBRA FRAC PERFORATIONS: 2241'-46',2249'-54' (4 SPF. 40 HOLES) FRAC 1ST STAGE: 14 BBL ACID, 40,124 FRAC FLUID INC. PAD, 32,000 # 20/40 BRADY SAND PERFORATIONS: 2181'-84', 2136'-39', 2142'-45' (4 SPF. 36 HOLES) FRAC 2ND STAGE: 11 BBL ACID, 40,022 FRAC FLUID INC. PAD, 32,000# 20/40 BRADY SAND PERFORATIONS: 2020'-23', 2025'-27', 2029'-32' (4 SPF, 32 HOLES) FRAC 3RD STAGE: 11 BBL ACID, 24,861 FRAC FLUID INC. PAD, 16,000# 20/40 BRADY SAND PERFORATIONS: 1956'-62', 1982'-85' (4 SPF. 36 HOLES) FRAC 4TH STAGE: 14 BBL ACID, 28, 797 FRAC FLUID INC. PAD 20,000# 20/40 BRADY SANDY |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2282 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/6/2001 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 259 | | BBLS_OIL | 0 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 259 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 25 | | MCF_GAS | 0 |
| | Perforation Data: | | Interval Top: | 1956 ft. | # Of Holes: | 144 | | Interval Bottom: | 2254 ft. | Hole Size: | 4 in. |
|
Formation RTON Formation Classification: GW Status: CM - 8/5/2006 Interval Top: 666 ft. Interval Bottom: 1513 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/4/2006 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/5/2006 | | Treatment Summary: | ACIDIZED W/2000 GALS 15% HCI ACID. FRAC'D W/183,333 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 17,600# 16/30 AND 283,305# 12/20 BRADY SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1611 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/5/2006 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 95 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 95 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 2 | | CASING_PRESS | 2 | | GRAVITY_OIL | 0.582 | | MCF_GAS | 2 | | TUBING_PRESS | 2 |
| | Perforation Data: | | Interval Top: | 666 ft. | # Of Holes: | 63 | | Interval Bottom: | 1513 ft. | Hole Size: | 0.4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 8/5/2006| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/4/2006 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RT-VJ. |
| | No Perforation Data was found for formation RT-VJ. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 6860 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 3.235 |
| Average MCFE per Day | 18.789 |
| Federal Financial Assurance | i | |
|
|