Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07351
Well Classification: CBM Status: PR - 8/30/2009
Well Name/No:HILL RANCH #15-01V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/30/2009
FacilityID:260012LocationID:307990
County:LAS ANIMAS #071Location:NENE 15 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8084 ft.
Planned Location:472FNL  908 FELLat/Long: 37.003235 / -104.869148Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.003180 / -104.869070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/30/2009             Measured TD: 2485 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/30/2009
Wellbore Permit
Permit #:20010867 Expiration Date:5/3/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:8/10/2001
Spud Date:6/8/2001Spud Date Is:ACTUAL
Measured TD:2485 ft.Measured PB depth:2471 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL,SIL,CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 210 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 210 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2428 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 2428 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2062 ft.NN
VERMEJO COAL2062 ft.2326 ft.NN
TRINIDAD2326 ft.2485 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 8/30/2009                 Interval Top: 2073 ft.    Interval Bottom: 2308 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/9/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/3/2009
Treatment Summary:ACIDIZED W/ 1,200 15% HCI ACID. REFRAC'D W/74,138 GALS 20# DELTA 140 W/ SANDWEDGE OS CARRYING 7,959# 16/30 BRADY SAND & 151,475# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 136
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 136
CALC_MCF_GAS 2
CASING_PRESS 25
MCF_GAS 2
Perforation Data:
Interval Top:2073 ft.# Of Holes:
Interval Bottom:2308 ft.Hole Size:

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 8/30/2009                 Interval Top: 506 ft.    Interval Bottom: 2308 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:8/27/2009Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/10/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2351 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/30/2009Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 89
BTU_GAS 1009
CALC_BBLS_H2O 89
CALC_BBLS_OIL 0
CALC_MCF_GAS 12
CASING_PRESS 25
MCF_GAS 12
TUBING_PRESS 4
Perforation Data:
Interval Top:506 ft.# Of Holes:
Interval Bottom:2308 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 8/30/2009                 Interval Top: 506 ft.    Interval Bottom: 1422 ft.

 Completed Information for Formation RATON COAL
1st Production Date:8/27/2009Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/4/2009
Treatment Summary:ACIDIZED W/4,000 GALS 15% HCI ACID. FRAC'D W/ 94,926 GAL 20# DELTA 140 W/SANDWEDGE OS CARRYING 30,700# 16/30 BRADY SD & 329,851# 12/20 BRADY SAND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:506 ft.# Of Holes:104
Interval Bottom:1422 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)41383
GOR
GOR DeterminationMCFE
Average BOE per Day19.315
Average MCFE per Day112.044

 Federal Financial Assurance  i 

 Tribal Well  i No