Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07346
Well Classification: CBM Status: PR - 10/1/2014
Well Name/No:HILL RANCH #01-05V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2014
FacilityID:260007LocationID:307988
County:LAS ANIMAS #071Location:SWNW 1 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7892 ft.
Basin:RATON BASIN  
Planned Location:1497FNL  716 FWLLat/Long: 37.029375 / -104.845498Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.029297 / -104.845404Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2014             Measured TD: 2365 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2014
Wellbore Permit
Permit #:20010862 Expiration Date:5/3/2002
Proposed Depth/Form:2495 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:11/16/2001
Spud Date:6/18/2001Spud Date Is:ACTUAL
Measured TD:2365 ft.Measured PB depth:2346 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL,SIL,CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 344 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 95, Top: 0 ft., Bottom: 344 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2341 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 40 ft., Bottom: 2341 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1935 ft.NN
VERMEJO COAL1935 ft.2206 ft.NN
TRINIDAD2206 ft.2365 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  TA - 5/1/2020                  Interval Top: 1877 ft.    Interval Bottom: 2170 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:9/7/2006
Treatment Summary:Status Change
Formation Treatment
Treatment Date:12/6/2001
Treatment Summary:SLICK WATER COBRA FRAC PERFORATIONS: 2160'-2163'-2166'-70' (4 SPF, 28 HOLES) FRAC 1ST STAGE: 56 BBL ACID, 24,351 FRAC FLUID INC. PAD, 16,000# 20/40 BRADY SAND PERFORATIONS: 2076'-79', 2084'-86', 2088'-91', 2093'-96' (4 SPF, 44 HOLES) FRAC 2ND STAGE: 36 BBL ACID , 29,719 FRAC FLUID INC. PAD, 16,013# 20/40 BRADY SAND PERFORATIONS: 1937'-40', 1944'-47' (4 SPF, 24 HOLES) FRAC 3RD STAGE: 37 BBL ACCID, 24,133 FRAC FLUID INC. PAD, 16,000# 20/40 BRADY SAND PERFORATIONS: 1877'-87' ( 4 SPF, 40 HOLES) FRAC 4TH STAGE: 27 BBL ACID, 40,074 FRAC FLUID INC. PAD, 32,000# 20/40 BRADY SAND
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 218
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 218
CALC_BBLS_OIL 0
CALC_MCF_GAS 3
CASING_PRESS 25
MCF_GAS 3
Perforation Data:
Interval Top:1877 ft.# Of Holes:136
Interval Bottom:2170 ft.Hole Size:4 in.

Formation RTON                     Formation Classification:  GW                     Status:  PR - 10/1/2014                 Interval Top: 570 ft.    Interval Bottom: 1400 ft.

 Completed Information for Formation RATON COAL
1st Production Date:9/27/2006Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:9/8/2006
Treatment Summary:ACIDIZED W/3000 GALS 15% HCL ACID. FRAC'D W/177,526 GALS 20# DELTA 140 W/SANDWEDGE NT CARRYING 16,900# 16/30 AND 310,141# 12/20 BRADY SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1501 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/28/2006Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 95
BBLS_OIL 0
BTU_GAS 1002
CALC_BBLS_H2O 95
CALC_BBLS_OIL 0
CALC_MCF_GAS 4
CASING_PRESS 5
GRAVITY_OIL 1
MCF_GAS 4
TUBING_PRESS 3
Perforation Data:
Interval Top:570 ft.# Of Holes:65
Interval Bottom:1400 ft.Hole Size:0.46 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)11335
GOR
GOR DeterminationMCFE
Average BOE per Day5.351
Average MCFE per Day31.056

 Federal Financial Assurance  i 

 Tribal Well  i No