|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 2/1/2026 Measured TD: 2290 ft. Vertical TD: 2290 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 2/1/2026 | | Wellbore Permit | | | Permit #: | 20010767 | Expiration Date: | 4/24/2002 | | Proposed Depth/Form: | 2470 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/8/2001 | | Spud Date: | 10/19/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 2290 ft. | Measured PB depth: | 2214 ft. | | True Vertical TD: | 2290 ft. | True Vertical PB depth: | 2214 ft. | | Log Types: | ARRAY INDUCTION,ENLD,CBL AND MUD LOG. | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 225 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 70, Top: 0 ft., Bottom: 225 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2237 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 294, Top: 102 ft., Bottom: 2290 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1634 ft. | N | N | | VERMEJO COAL | 1789 ft. | 2053 ft. | N | N | | TRINIDAD | 2062 ft. | | N | N |
Formation RT-VJ Formation Classification: GW Status: PR - 2/1/2026 Interval Top: 1051 ft. Interval Bottom: 2053 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 12/11/2001 | Choke Size: | 0.250 in. | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | | Production Method: | PUMPING CBM GAS WELL. PRODUED WATER INJECTED IN WDW. | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/8/2001 | | Treatment Summary: | 11/28/01 PUMPED 850 GALS OF 7.5% HCL ACID, 1,344,269 SCF N2 WITH 279,260 LBS OF 16/30 MESH SAND AT 16 BPM (STAGE 1 THRU STAGE 9) THRU 160" HOLES 1051' - 2053'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2107 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 12/11/2001 | Test Method: | PUMPING FLOW | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 0 | | CALC_BBLS_H2O | 0 | | CALC_MCF_GAS | 10 | | CASING_PRESS | 28 | | MCF_GAS | 10 |
| | Perforation Data: | | Interval Top: | 1051 ft. | # Of Holes: | 160 | | Interval Bottom: | 2053 ft. | Hole Size: | 0.51 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 808 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.383 |
| Average MCFE per Day | 2.208 |
| Federal Financial Assurance | i | |
|
|