Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07307
Well Classification: CBM Status: PR - 10/7/2001
Well Name/No:VPR C #56
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/7/2001
FacilityID:259838LocationID:307954
County:LAS ANIMAS #071Location:SWSW 35 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7618 ft.
Basin:RATON BASIN  
Planned Location:555FSL  748 FWLLat/Long: 37.035435 / -104.755255Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.035420 / -104.755250Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 2/23/2011
End Date: 2/23/2011
Reported: 9/14/2011
Prior to rule 205A.b.(2)(A)
Days to report: 203
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/7/2001             Measured TD: 2095 ft.    Vertical TD: 2095 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/7/2001
Wellbore Permit
Permit #:20010719 Expiration Date:4/18/2002
Proposed Depth/Form:2268 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:10/5/2001
Spud Date:9/13/2001Spud Date Is:ACTUAL
Measured TD:2095 ft.Measured PB depth:2012 ft.
True Vertical TD:2095 ft.True Vertical PB depth:2012 ft.
Log Types:ARRAY INDUCTION EPITHERMAL NEUTRON LITHO DENSITY AND CEMENT BOND LOG
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 223 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 223 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2039 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 2011 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1491 ft.NN
VERMEJO COAL1596 ft.1863 ft.NN
TRINIDAD1868 ft.NN

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/7/2001                 Interval Top: 844 ft.    Interval Bottom: 1862 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:10/7/2001Choke Size:0.250 in.
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:10/5/2001
Treatment Summary:09/19/2001-PUMPED 1,400 GALS OF 7.5% HCL, 114 BALL SEALERS, 1,225,000 SCF N2 WITH 207,800 LBS OF 16/30 MESH SAND AT 16 BPM (STAGE 1 & STAGE 4) THRU 124 HOLES 844' - 1862'..
Tubing Size:2.875 in.Tubing Setting Depth:1919 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/7/2001Test Method:PUMPING FLOW TE
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 171
CALC_BBLS_H2O 171
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:844 ft.# Of Holes:124
Interval Bottom:1862 ft.Hole Size:0.51 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)10813
GOR
GOR DeterminationMCFE
Average BOE per Day5.110
Average MCFE per Day29.625

 Federal Financial Assurance  i 

 Tribal Well  i No