Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07297
Well Classification: CBM Status: PR - 3/7/2010
Well Name/No:HILL RANCH #16-04V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/7/2010
FacilityID:259817LocationID:307948
County:LAS ANIMAS #071Location:NWNW 16 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8201 ft.
Basin:RATON BASIN  
Planned Location:942FNL  1222 FWLLat/Long: 37.001935 / -104.897959Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.001910 / -104.897960Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 3/7/2010             Measured TD: 2545 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 3/7/2010
Wellbore Permit
Permit #:20010695 Expiration Date:4/15/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:6/28/2001
Spud Date:5/31/2002Spud Date Is:ACTUAL
Measured TD:2545 ft.Measured PB depth:2528 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 212 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 55, Top: 0 ft., Bottom: 212 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2522 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 385, Top: 0 ft., Bottom: 2522 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2142 ft.NN
VERMEJO COAL2142 ft.2422 ft.NN
TRINIDAD2422 ft.2545 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/7/2010                  Interval Top: 2149 ft.    Interval Bottom: 2399 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:8/4/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2010
Treatment Summary:NEW PERFS ADDED FROM 2149' - 2150' (3 HOLES). ACIDIZED W/ 1,000 GALS 15% HCI ACID. REFRAC'D W/ 78,766 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 7500# 16/30 BRADY SND & 141,180# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 224
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 224
CALC_MCF_GAS 12
CASING_PRESS 25
MCF_GAS 12
Perforation Data:
Interval Top:2149 ft.# Of Holes:59
Interval Bottom:2399 ft.Hole Size:0.4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 3/7/2010                  Interval Top: 529 ft.    Interval Bottom: 2399 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/4/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:6/28/2001
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2458 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/7/2010Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 125
BTU_GAS 1021
CALC_BBLS_H2O 125
CALC_BBLS_OIL 0
CALC_MCF_GAS 137
CASING_PRESS 4
MCF_GAS 137
TUBING_PRESS 2
Perforation Data:
Interval Top:529 ft.# Of Holes:104
Interval Bottom:2399 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/7/2010                  Interval Top: 529 ft.    Interval Bottom: 1483 ft.

 Completed Information for Formation RATON COAL
1st Production Date:3/4/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/1/2010
Treatment Summary:ACIDIZED W/ 2,000 GALS 15% HCI ACID. FRAC'D W/ 95,626 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 17,445# 16/30 BRADY SND & 147,551# 12/20 BRADY SND.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:529 ft.# Of Holes:45
Interval Bottom:1483 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19230
GOR
GOR DeterminationMCFE
Average BOE per Day9.083
Average MCFE per Day52.673

 Federal Financial Assurance  i 

 Tribal Well  i No