Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07285
Well Classification: CBM Status: PR - 10/2/2005
Well Name/No:HILL RANCH #27-02V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/2/2005
FacilityID:259800LocationID:307943
County:LAS ANIMAS #071Location:NWNE 27 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7862 ft.
Planned Location:348FNL  1658 FELLat/Long: 37.061524 / -104.871679Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.061550 / -104.871780Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/2/2005             Measured TD: 2425 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/2/2005
Wellbore Permit
Permit #:010680 Expiration Date:4/12/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:1/3/2002
Spud Date:5/10/2001Spud Date Is:ACTUAL
Measured TD:2425 ft.Measured PB depth:2416 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL,SIL,CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 634 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 175, Top: 0 ft., Bottom: 634 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2367 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 360, Top: 0 ft., Bottom: 2367 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1894 ft.NN
VERMEJO COAL1894 ft.2229 ft.NN
TRINIDAD2229 ft.2425 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/30/2006                 Interval Top: 1897 ft.    Interval Bottom: 2211 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:5/1/2001Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2002
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2254 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/8/2002Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 120
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 120
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 1
CASING_PRESS 25
MCF_GAS 1
Perforation Data:
Interval Top:1897 ft.# Of Holes:192
Interval Bottom:2211 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/2/2005                 Interval Top: 794 ft.    Interval Bottom: 2211 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:PC PUMP
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2002
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2267 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/2/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 449
BBLS_OIL 0
BTU_GAS 1006
CASING_PRESS 20
MCF_GAS 79
TUBING_PRESS 21
Perforation Data:
Interval Top:794 ft.# Of Holes:
Interval Bottom:2211 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 5/28/2005                 Interval Top: 794 ft.    Interval Bottom: 1886 ft.

 Completed Information for Formation RATON COAL
1st Production Date:5/28/2005Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/3/2002
Treatment Summary:SEE SCANNED DOC#1422729
Tubing Size:2.875 in.Tubing Setting Depth:1855 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/28/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 180
CASING_PRESS 65
MCF_GAS 40
TUBING_PRESS 10
Perforation Data:
Interval Top:794 ft.# Of Holes:72
Interval Bottom:1886 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)27553
GOR
GOR DeterminationMCFE
Average BOE per Day13.014
Average MCFE per Day75.472

 Federal Financial Assurance  i 

 Tribal Well  i No