|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 10/2/2005 Measured TD: 2425 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 10/2/2005 | Wellbore Permit | | Permit #: | 010680 | Expiration Date: | 4/12/2002 | Proposed Depth/Form: | 2800 ft. | Surface Mineral Owner Same: | Yes | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 1/3/2002 | Spud Date: | 5/10/2001 | Spud Date Is: | ACTUAL | Measured TD: | 2425 ft. | Measured PB depth: | 2416 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | CDL,SIL,CBL | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 634 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 175, Top: 0 ft., Bottom: 634 ft., Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2367 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 360, Top: 0 ft., Bottom: 2367 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 0 ft. | 1894 ft. | N | N | VERMEJO COAL | 1894 ft. | 2229 ft. | N | N | TRINIDAD | 2229 ft. | 2425 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 3/30/2006 Interval Top: 1897 ft. Interval Bottom: 2211 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | 5/1/2001 | Choke Size: | | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | PUMPING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/3/2002 | Treatment Summary: | |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2254 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 1/8/2002 | Test Method: | ORIFICE METER | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 120 | BBLS_OIL | 0 | BTU_GAS | 1000 | CALC_BBLS_H2O | 120 | CALC_BBLS_OIL | 0 | CALC_GOR | 0 | CALC_MCF_GAS | 1 | CASING_PRESS | 25 | MCF_GAS | 1 |
| Perforation Data: | Interval Top: | 1897 ft. | # Of Holes: | 192 | Interval Bottom: | 2211 ft. | Hole Size: | 4 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 10/2/2005 Interval Top: 794 ft. Interval Bottom: 2211 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | Yes | Production Method: | PC PUMP | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/3/2002 | Treatment Summary: | |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2267 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/2/2005 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 449 | BBLS_OIL | 0 | BTU_GAS | 1006 | CASING_PRESS | 20 | MCF_GAS | 79 | TUBING_PRESS | 21 |
| Perforation Data: | Interval Top: | 794 ft. | # Of Holes: | | Interval Bottom: | 2211 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 5/28/2005 Interval Top: 794 ft. Interval Bottom: 1886 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 5/28/2005 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/3/2002 | Treatment Summary: | SEE SCANNED DOC#1422729 |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1855 ft. | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 5/28/2005 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 180 | CASING_PRESS | 65 | MCF_GAS | 40 | TUBING_PRESS | 10 |
| Perforation Data: | Interval Top: | 794 ft. | # Of Holes: | 72 | Interval Bottom: | 1886 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 27553 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 13.014 |
Average MCFE per Day | 75.472 |
Federal Financial Assurance | i | |
|
|