Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07278
Well Classification: CBM Status: PR - 10/1/2024
Well Name/No:VPR C #87
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2024
FacilityID:259793LocationID:307939
County:LAS ANIMAS #071Location:NESE 32 34S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:7692 ft.
Basin:RATON BASIN  
Planned Location:1885FSL  317 FELLat/Long: 37.039075 / -104.795086Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.039060 / -104.795080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2024             Measured TD: 2260 ft.    Vertical TD: 2260 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2024
Wellbore Permit
Permit #:20010673 Expiration Date:4/12/2002
Proposed Depth/Form:2350 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/3/2001
Spud Date:9/17/2001Spud Date Is:ACTUAL
Measured TD:2260 ft.Measured PB depth:2215 ft.
True Vertical TD:2260 ft.True Vertical PB depth:2215 ft.
Log Types:ARRAY INDUCTION,ENLD, AND CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 438 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 438 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2215 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 323, Top: 175 ft., Bottom: 2206 ft., Determination Method: CBL
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 175 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
RATON COAL150 ft.1763 ft.NN
VERMEJO COAL1756 ft.2022 ft.NN
TRINIDAD2036 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 6/5/2003                  Interval Top: 2015 ft.    Interval Bottom: 2022 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:12/7/2001Choke Size:0.250 in.
Formation Name:VERMEJO COALCommingled:
Production Method:PUMPING
Open Hole Completion:
Formation Treatment
Treatment Date:12/3/2001
Treatment Summary:11/19/01 PUMPED 25 GAL FRESH WATER,400 GAL 7.5% HCL ACID W/ADDITIVES AT 3 BPM, 100 GAL OF 7.5% HCL ACID, THEN 2010 GAL FRESH WATER. START 4,000 GALS FRESH WATER W/2 MIC IRIDIUM ZW RADIOACTIVE TRACER AT 16 BPM.
Tubing Size:2.875 in.Tubing Setting Depth:2067 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/7/2001Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 57
CALC_BBLS_H2O 57
CALC_MCF_GAS 0
MCF_GAS 0
Perforation Data:
Interval Top:2015 ft.# Of Holes:42
Interval Bottom:2022 ft.Hole Size:0.51 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/1/2024                 Interval Top: 827 ft.    Interval Bottom: 2004 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:12/7/2001Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Date:6/2/2003
Treatment Summary:PUMPED FRACTURE TREATMENT WITH 73,610 LBS OF 20/40 OTTAWA/TLC SAND AT 10.5 BPM, ATP 2,431 PSI, FINAL ISIP 962 PSI (STAGE 1: 2002'-2004', STAGE 2: 1874'-1876', STAGE 3: 1559'-1561', 1594'-1596', STAGE 4: 827'-829', 832'-834') 06-05-03 RUN PRODUCTION EQUIPMENT AND PUT BACK ON PRODUCTION
Formation Treatment
Treatment Date:12/3/2001
Treatment Summary:PUMPED 25 GALS OF FRESH WATER, 400 GALS OF 7.5% HCL ACID WITH ADDITIVES AT 3 BPM, 100 GALS OF 7.5% HCL ACID, THEN 2,010 GALS OF FRESH WATER. START 4,000 GALS FRESH WATER W/ 2 MIC IRIDIUM ZW RADIOACTIVE TRACER AT 16 BPM
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:827 ft.# Of Holes:30
Interval Bottom:2004 ft.Hole Size:0.51 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
01/2025 - 12/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)37
GOR
GOR DeterminationMCFE
Average BOE per Day0.014
Average MCFE per Day0.101

 Federal Financial Assurance  i 

 Tribal Well  i No