Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07213
Well Classification: CBM Status: PR - 5/6/2020
Well Name/No:HILL RANCH #22-01 V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/6/2020
FacilityID:259240LocationID:307897
County:LAS ANIMAS #071Location:NENE 22 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7903 ft.
Planned Location:713FNL  1066 FELLat/Long: 37.075024 / -104.869669Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.075040 / -104.869690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/6/2020             Measured TD: 2425 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/6/2020
Wellbore Permit
Permit #:010235 Expiration Date:2/6/2002
Proposed Depth/Form:2800 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:12/24/2001
Spud Date:5/6/2001Spud Date Is:ACTUAL
Measured TD:2425 ft.Measured PB depth:2419 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL ( 2 )
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 211 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 211 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2352 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 439, Top: 0 ft., Bottom: 2352 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.1743 ft.NN
VERMEJO COAL1743 ft.2288 ft.NN
TRINIDAD2288 ft.2368 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/29/2020                 Interval Top: 1916 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:12/24/2001
Treatment Summary:PERFORATIONS: 2208'-18',2222'-26' (4 SPF) FRAC 1ST STAGE: UNABLE TO PUMP 1/4# SAND. SCREEN OUT 20# LINEAR GEL FRAC PERFORATIONS: 2208'-18',2222'-26' (4 SPF) FRAC 1-A STAGE: PUMPED 50 GAL 7.5% HCL, PAD 110 BBL, SLF N/A, FLUSH 20 BBL. PERFORATIONS; 2138'-
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 124
BBLS_OIL 0
BTU_GAS 1000
CALC_BBLS_H2O 124
CALC_BBLS_OIL 0
CALC_MCF_GAS 1
CASING_PRESS 25
MCF_GAS 1
Perforation Data:
Interval Top:1916 ft.# Of Holes:152
Interval Bottom:2226 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 5/6/2020                  Interval Top: 372 ft.    Interval Bottom: 2226 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/30/2018Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:372 ft.# Of Holes:299
Interval Bottom:2226 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 10/3/2018                 Interval Top: 372 ft.    Interval Bottom: 1377 ft.

 Completed Information for Formation RATON COAL
1st Production Date:N/AChoke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/4/2018Treatment End Date:9/28/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1375' - 77', 1370' - 72', 1173' - 75', 1168' - 70', 1152' - 55' and 1115' - 18', Stage 2 - 1070' - 72', 1048' - 50', 1010' - 12', 983' - 85' and 919' - 21', Stage 3 - 889' - 90', 884' - 87', 880' - 82', 840' - 42' and 798' - 801', Stage 4 - 540' - 42', 516' - 18', 492' - 94', 469' - 72', 449' - 50' and 372' - 76' (49' net or 147 holes). A total of 156,622 gallons of produced water with 99,330 gallons of x-link and 105,849 lbs of 16/30 sand were pumped. All four stages were pumped according to design. The ECWS #28 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production as a commingled Raton Vermejo well.
Total fluid used in treatment (bbls):6094Max pressure during treatment (psi):3084
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.49
Recycled water used in treatment (bbls):6094Total flowback volume recovered (bbls):3689
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):105849Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/3/2018Test Method:Flowing
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
BTU_GAS 994
CALC_BBLS_H2O 10
CALC_MCF_GAS 9
MCF_GAS 9
Perforation Data:
Interval Top:372 ft.# Of Holes:147
Interval Bottom:1377 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)23037
GOR
GOR DeterminationMCFE
Average BOE per Day10.887
Average MCFE per Day63.108

 Federal Financial Assurance  i 

 Tribal Well  i No