Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-07151
Well Classification: CBM Status: PR - 7/24/2002
Well Name/No:HILL RANCH #05-06R
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/24/2002
FacilityID:258764LocationID:333960
County:LAS ANIMAS #071Location:SENW 5 35S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8103 ft.
Basin:RATON BASIN  
Planned Location:1352FNL  1327 FWLLat/Long: 37.029844 / -104.915710Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.029850 / -104.915690Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 7/24/2002             Measured TD: 1671 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 7/24/2002
Wellbore Permit
Permit #:20001461 Expiration Date:12/14/2001
Proposed Depth/Form:2000 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:7/12/2001
Spud Date:6/25/2001Spud Date Is:ACTUAL
Measured TD:1671 ft.Measured PB depth:1668 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CDL, SIL, CBL
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 214 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1640 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1640 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.2117 ft.NN

Formation RTON                     Formation Classification:  GW                     Status:  PR - 7/24/2002                 Interval Top: 1166 ft.    Interval Bottom: 1462 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/24/2002Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:PUMPING ( 30NO095 - PC )
Open Hole Completion:
Formation Treatment
Treatment Date:7/12/2001
Treatment Summary:CSG. FRAC W/ DELTA FOAM PERFORATIONS: 1421'-24', 1452'-55', 1460'-62' (4 SPF, 32 HOLES) FRAC 1ST STAGE: 14,700 FRAC FLUID INC. PAD, 51,800# 16/30 BRADY, 251,600 SCF N2, PERFORATIONS: 1282'-86', 1305'-08', 1318'-20' (4 SPF, 36 HOLES) FRAC 2ND STAGE: 13,685 FRAC FLUID INC. PAD, 51,200# 16/30 BRADY, 234,800 SCF N2, PERFORATIONS: 1166'-69' (4 SPF, 9 HOLES) FRAC 3RD STAGE: 5,289 FRAC FLUID INC. PAD, 15,350# 16/30 BRADY, 112,900 SCF N2,
Tubing Size:2.875 in.Tubing Setting Depth:1494 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/27/2001Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:
Test TypeMeasure
BBLS_H2O 104
BTU_GAS 1000
CALC_BBLS_H2O 104
CALC_MCF_GAS 2
CASING_PRESS 25
MCF_GAS 2
Perforation Data:
Interval Top:1166 ft.# Of Holes:77
Interval Bottom:1462 ft.Hole Size:4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13296
GOR
GOR DeterminationMCFE
Average BOE per Day6.281
Average MCFE per Day36.423

 Federal Financial Assurance  i 

 Tribal Well  i No