|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 7/24/2002 Measured TD: 1671 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 7/24/2002 | | Wellbore Permit | | | Permit #: | 20001461 | Expiration Date: | 12/14/2001 | | Proposed Depth/Form: | 2000 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/12/2001 | | Spud Date: | 6/25/2001 | Spud Date Is: | ACTUAL | | Measured TD: | 1671 ft. | Measured PB depth: | 1668 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CDL, SIL, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 214 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1640 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 325, Top: 0 ft., Bottom: 1640 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 2117 ft. | N | N |
Formation RTON Formation Classification: GW Status: PR - 7/24/2002 Interval Top: 1166 ft. Interval Bottom: 1462 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 7/24/2002 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | | | Production Method: | PUMPING ( 30NO095 - PC ) | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 7/12/2001 | | Treatment Summary: | CSG. FRAC W/ DELTA FOAM PERFORATIONS: 1421'-24', 1452'-55', 1460'-62' (4 SPF, 32 HOLES) FRAC 1ST STAGE: 14,700 FRAC FLUID INC. PAD, 51,800# 16/30 BRADY, 251,600 SCF N2, PERFORATIONS: 1282'-86', 1305'-08', 1318'-20' (4 SPF, 36 HOLES) FRAC 2ND STAGE: 13,685 FRAC FLUID INC. PAD, 51,200# 16/30 BRADY, 234,800 SCF N2, PERFORATIONS: 1166'-69' (4 SPF, 9 HOLES) FRAC 3RD STAGE: 5,289 FRAC FLUID INC. PAD, 15,350# 16/30 BRADY, 112,900 SCF N2, |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1494 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 7/27/2001 | Test Method: | ORIFICE METER | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 104 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 104 | | CALC_MCF_GAS | 2 | | CASING_PRESS | 25 | | MCF_GAS | 2 |
| | Perforation Data: | | Interval Top: | 1166 ft. | # Of Holes: | 77 | | Interval Bottom: | 1462 ft. | Hole Size: | 4 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 13296 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 6.281 |
| Average MCFE per Day | 36.423 |
| Federal Financial Assurance | i | |
|
|