|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/26/2009 Measured TD: 2410 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/26/2009 | | Wellbore Permit | | | Permit #: | 001285 | Expiration Date: | 11/21/2001 | | Proposed Depth/Form: | 2800 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/19/2001 | | Spud Date: | 12/8/2000 | Spud Date Is: | ACTUAL | | Measured TD: | 2410 ft. | Measured PB depth: | 2330 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | INDUCITON , DENSITY, NEUTRON & CEMENT BOND LOGS | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 214 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 53, Top: 0 ft., Bottom: 214 ft., Determination Method: CALC | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2480 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 288, Top: 350 ft., Bottom: 2480 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 52, Top: 0 ft., Bottom: 350 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: , Size: , Top: 0 ft., Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON SAND | 0 ft. | 2016 ft. | N | N | | VERMEJO COAL | 2016 ft. | 2330 ft. | N | N | | TRINIDAD | 2330 ft. | 2410 ft. | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 8/26/2009 Interval Top: 2029 ft. Interval Bottom: 2315 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 3/1/2001 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/17/2009 | | Treatment Summary: | ACIDIZED W/2200 GALS 15% HCL ACID. REFRAC'D W/97588 GAL 20# DELTA 140 W/SANDWEDGE OS CARRYING 14507# 16/30 BRADY SD AND 166044# 12/20 BRADY SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 356 | | BBLS_OIL | 0 | | BTU_GAS | 984 | | CALC_BBLS_H2O | 356 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 39 | | CASING_PRESS | 25 | | MCF_GAS | 39 |
| | Perforation Data: | | Interval Top: | 2029 ft. | # Of Holes: | | | Interval Bottom: | 2315 ft. | Hole Size: | |
|
Formation RT-VJ Formation Classification: GW Status: PR - 8/26/2009 Interval Top: 541 ft. Interval Bottom: 2315 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/19/2001 | | Treatment Summary: | |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2332 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/26/2009 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 34 | | BTU_GAS | 108 | | CALC_BBLS_H2O | 34 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 15 | | CASING_PRESS | 27 | | MCF_GAS | 15 | | TUBING_PRESS | 4 |
| | Perforation Data: | | Interval Top: | 541 ft. | # Of Holes: | | | Interval Bottom: | 2315 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 8/26/2009 Interval Top: 541 ft. Interval Bottom: 1296 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/24/2009 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 8/17/2009 | | Treatment Summary: | ACIDIZE W/3000 GALS 15% HCL ACID. FRAC'D W/136518 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 18760# 16/30 BRADY SD AND 278299# 12/20 BRADY SD. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 541 ft. | # Of Holes: | 72 | | Interval Bottom: | 1296 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 24727 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 11.673 |
| Average MCFE per Day | 67.709 |
| Federal Financial Assurance | i | |
|
|