|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/30/2014 Measured TD: 2465 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/30/2014 | Wellbore Permit | | Permit #: | 20086567 | Expiration Date: | 10/8/2009 | Proposed Depth/Form: | 2453 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit: | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 341 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 125, Top: 0 ft., Bottom: 341 ft. | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2453 ft., Weight: 15.5 , Citings Type: PLANNED | Cement: | Sacks: 325, Top: 740 ft., Bottom: 2453 ft. | Casing: | String Type: 2ND, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | Cement: | Sacks: 80, Top: 32 ft., Bottom: 740 ft. |
| | |
Wellbore Completed | Completion Date: | 3/2/2000 | Spud Date: | 3/1/2000 | Spud Date Is: | ACTUAL | Measured TD: | 2465 ft. | Measured PB depth: | 2460 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | ARRAY IND, COMP PHOTO-DENSITY,GAMMA RAY | Log Types: | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 341 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 125, Top: 0 ft., Bottom: 341 ft., Determination Method: CALC | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2453 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: 325, Top: 740 ft., Bottom: 2453 ft., Determination Method: CBL | Casing: | String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | Cement: | Sacks: 80, Top: 32 ft., Bottom: 740 ft., Determination Method: CBL | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 650 ft. | 2132 ft. | N | N | VERMEJO COAL | 2182 ft. | 2420 ft. | N | N | TRINIDAD | 2424 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: CM - 4/30/2000 Interval Top: 2192 ft. Interval Bottom: 2400 ft. Completed Information for Formation VERMEJO COAL | 1st Production Date: | N/A | Choke Size: | 2.000 in. | Formation Name: | VERMEJO COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 3/26/2000 | Treatment Summary: | (2192-2196, 2209-2213, 2216-2220) (2309-2313, 2315-1319, 2329-2333, 2355-2359) (2388-2392, 2396-2400) TOTAL 50,000 12/20 SAND 1,020,000 SCF 70% QUALITY NITROGEN |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2412 ft. | Tubing Packer Depth: | 2448 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/30/2000 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 209 | BTU_GAS | 1009 | CALC_BBLS_H2O | 209 | CALC_MCF_GAS | 42 | CASING_PRESS | 10 | MCF_GAS | 42 |
| Perforation Data: | Interval Top: | 2192 ft. | # Of Holes: | 144 | Interval Bottom: | 2400 ft. | Hole Size: | 0.48 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 11/10/2008 Interval Top: 1371 ft. Interval Bottom: 2400 ft. Completed Information for Formation RATON-VERMEJO COALS | 1st Production Date: | N/A | Choke Size: | | Formation Name: | RATON-VERMEJO COALS | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RT-VJ. |
| Perforation Data: | Interval Top: | 1371 ft. | # Of Holes: | | Interval Bottom: | 2400 ft. | Hole Size: | |
|
Formation RTON Formation Classification: GW Status: CM - 4/30/2014 Interval Top: 1371 ft. Interval Bottom: 1597 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 11/10/2008 | Choke Size: | 0.156 in. | Formation Name: | RATON COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 10/23/2008 | Treatment Summary: | ( 1594-1597, 1563-1566, 1537-1540) (1493-1497, 1473-1481, 1422-1424, 1371-1373) TOTAL 401,165 75% QUALITY NITROGEN AND TOATAL 98,632 LBS 20/40 SAND |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2413 ft. | Tubing Packer Depth: | 2460 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 11/10/2008 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BTU_GAS | 1013 | CALC_BBLS_H2O | 127 | CALC_MCF_GAS | 57 | CASING_PRESS | 92 | TUBING_PRESS | 68 |
| Perforation Data: | Interval Top: | 1371 ft. | # Of Holes: | 116 | Interval Bottom: | 1597 ft. | Hole Size: | 3.125 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 27951 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 13.211 |
Average MCFE per Day | 76.642 |
Federal Financial Assurance | i | |
|
|