Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06934
Well Classification: CBM Status: PR - 4/30/2014
Well Name/No:VPR C #28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:WAPITI OPERATING LLC - 10351
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/30/2014
FacilityID:256745LocationID:307769
County:LAS ANIMAS #071Location:SENE 17 35S66W 6
Field:PURGATOIRE RIVER - #70830Elevation:8186 ft.
Planned Location:1745FNL  1295 FELLat/Long: 37.000106 / -104.798426Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.000090 / -104.798420Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/30/2014             Measured TD: 2465 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/30/2014
Wellbore Permit
Permit #:20086567 Expiration Date:10/8/2009
Proposed Depth/Form:2453 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 341 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 125, Top: 0 ft., Bottom: 341 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2453 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 325, Top: 740 ft., Bottom: 2453 ft.
Casing:String Type: 2ND, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED
Cement:Sacks: 80, Top: 32 ft., Bottom: 740 ft.

Wellbore Completed
Completion Date:3/2/2000
Spud Date:3/1/2000Spud Date Is:ACTUAL
Measured TD:2465 ft.Measured PB depth:2460 ft.
True Vertical TD:True Vertical PB depth:
Log Types:ARRAY IND, COMP PHOTO-DENSITY,GAMMA RAY
Log Types:
Casing:String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: , Depth: 341 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 125, Top: 0 ft., Bottom: 341 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2453 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 740 ft., Bottom: 2453 ft., Determination Method: CBL
Casing:String Type: S.C. 1.2, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL
Cement:Sacks: 80, Top: 32 ft., Bottom: 740 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
RATON COAL650 ft.2132 ft.NN
VERMEJO COAL2182 ft.2420 ft.NN
TRINIDAD2424 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/30/2000                 Interval Top: 2192 ft.    Interval Bottom: 2400 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:N/AChoke Size:2.000 in.
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/26/2000
Treatment Summary:(2192-2196, 2209-2213, 2216-2220) (2309-2313, 2315-1319, 2329-2333, 2355-2359) (2388-2392, 2396-2400) TOTAL 50,000 12/20 SAND 1,020,000 SCF 70% QUALITY NITROGEN
Tubing Size:2.875 in.Tubing Setting Depth:2412 ft.
Tubing Packer Depth:2448 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/30/2000Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 209
BTU_GAS 1009
CALC_BBLS_H2O 209
CALC_MCF_GAS 42
CASING_PRESS 10
MCF_GAS 42
Perforation Data:
Interval Top:2192 ft.# Of Holes:144
Interval Bottom:2400 ft.Hole Size:0.48 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 11/10/2008                Interval Top: 1371 ft.    Interval Bottom: 2400 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:N/AChoke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
Perforation Data:
Interval Top:1371 ft.# Of Holes:
Interval Bottom:2400 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/30/2014                 Interval Top: 1371 ft.    Interval Bottom: 1597 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/10/2008Choke Size:0.156 in.
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/23/2008
Treatment Summary:( 1594-1597, 1563-1566, 1537-1540) (1493-1497, 1473-1481, 1422-1424, 1371-1373) TOTAL 401,165 75% QUALITY NITROGEN AND TOATAL 98,632 LBS 20/40 SAND
Tubing Size:2.875 in.Tubing Setting Depth:2413 ft.
Tubing Packer Depth:2460 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/10/2008Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1013
CALC_BBLS_H2O 127
CALC_MCF_GAS 57
CASING_PRESS 92
TUBING_PRESS 68
Perforation Data:
Interval Top:1371 ft.# Of Holes:116
Interval Bottom:1597 ft.Hole Size:3.125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
March 2024 - February 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)27951
GOR
GOR DeterminationMCFE
Average BOE per Day13.211
Average MCFE per Day76.642

 Federal Financial Assurance  i 

 Tribal Well  i No