Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06915
Well Classification: CBM Status: PR - 10/1/2005
Well Name/No:HILL RANCH #32-13V
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2005
FacilityID:256548LocationID:307750
County:LAS ANIMAS #071Location:SWSW 32 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8116 ft.
Planned Location:994FSL  828 FWLLat/Long: 37.036284 / -104.917430Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.036270 / -104.917410Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 10/1/2005             Measured TD: 2520 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 10/1/2005
Wellbore Permit
Permit #:000011 Expiration Date:1/3/2000
Proposed Depth/Form:2600 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:2/24/2000
Spud Date:1/26/2000Spud Date Is:ACTUAL
Measured TD:2520 ft.Measured PB depth:2499 ft.
True Vertical TD:True Vertical PB depth:
Log Types:COM DEN, IND, CB
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 227 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 50, Top: 0 ft., Bottom: 227 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2451 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: 2451 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL2191 ft.2396 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 5/30/2006                 Interval Top: 2106 ft.    Interval Bottom: 2396 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/17/2000Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/24/2000
Treatment Summary:2392-96,2382-86 FRAC 1ST STAGE W/25000# 20/40 75000# 16/30 & 425000 SCF N2. 2228-30 2220-22 2191-93 FRAC 2ND STATE W/25000# 20/40 75000# 16/30 36 SOLU BALLS & 390000 SCF N2. 2106-16 TREATED ZONE W/: 7.5% HCL.
Tubing Size:2.875 in.Tubing Setting Depth:2405 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/17/2000Test Method:ORIFICE METER
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 356
BBLS_OIL 0
BTU_GAS 1004
CALC_BBLS_H2O 326
CALC_BBLS_OIL 0
CALC_MCF_GAS 0
CASING_PRESS 25
MCF_GAS 0
Perforation Data:
Interval Top:2106 ft.# Of Holes:96
Interval Bottom:2396 ft.Hole Size:4 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 10/1/2005                 Interval Top: 925 ft.    Interval Bottom: 2392 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:7/8/2005Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:Yes
Production Method:PUMPING
Open Hole Completion:No
Formation Treatment
Treatment Date:2/24/2000
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:2427 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/1/2005Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 602
BBLS_OIL 0
BTU_GAS 996
CALC_BBLS_H2O 602
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 111
CASING_PRESS 12
MCF_GAS 111
TUBING_PRESS 15
Perforation Data:
Interval Top:925 ft.# Of Holes:
Interval Bottom:2392 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 7/8/2005                  Interval Top: 925 ft.    Interval Bottom: 1387 ft.

 Completed Information for Formation RATON COAL
1st Production Date:7/8/2005Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:2/24/2000
Treatment Summary:A.W/1,500 GALS 15% HCL AC.FRAC'D W/134,354 GALS 20# DELTA 140 SW NT CARRYING 15,752# 16/30 & 228,327# 12/20 BRADY SD,
Tubing Size:2.875 in.Tubing Setting Depth:1486 ft.
Tubing Packer Depth:1208 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/8/2005Test Method:PUMPING
Hours Tested:9Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 76
CALC_BBLS_H2O 110
CASING_PRESS 3
TUBING_PRESS 3
Perforation Data:
Interval Top:925 ft.# Of Holes:52
Interval Bottom:1387 ft.Hole Size:0.4 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)13683
GOR
GOR DeterminationMCFE
Average BOE per Day6.462
Average MCFE per Day37.498

 Federal Financial Assurance  i 

 Tribal Well  i No