|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 9/15/1999 Measured TD: 2196 ft. Vertical TD: 2196 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 9/15/1999 | | Wellbore Permit | | | Permit #: | 19990401 | Expiration Date: | 6/10/2000 | | Proposed Depth/Form: | 1625 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 7/28/1999 | | Spud Date: | 7/3/1999 | Spud Date Is: | ACTUAL | | Measured TD: | 2196 ft. | Measured PB depth: | 2183 ft. | | True Vertical TD: | 2196 ft. | True Vertical PB depth: | 2183 ft. | | Log Types: | COMPENSATED DENSITY INDUCTION LOG; GAMMA RAY/CEMENT BOND LOG | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 353 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 353 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2184 ft., Weight: 15.50 , Citings Type: ACTUAL | | Cement: | Sacks: 250, Top: 150 ft., Bottom: 2184 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 1868 ft. | N | N | | VERMEJO COAL | 1868 ft. | 2060 ft. | N | N | | TRINIDAD | 2060 ft. | 2158 ft. | N | N | | PIERRE | 2158 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 9/15/1999 Interval Top: 1912 ft. Interval Bottom: 2044 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | PC PUMP | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/28/1999 | | Treatment Summary: | SEE SCANNED DOC#827409 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2068 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/15/1999 | Test Method: | PC PUMP | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 137 | | BTU_GAS | 100 | | CALC_BBLS_H2O | 137 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 100 | | CASING_PRESS | 7 | | MCF_GAS | 100 |
| | Perforation Data: | | Interval Top: | 1912 ft. | # Of Holes: | 100 | | Interval Bottom: | 2044 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 18090 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 8.546 |
| Average MCFE per Day | 49.552 |
| Federal Financial Assurance | i | |
|
|