|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 3/1/2019 Measured TD: 1377 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 3/1/2019 | | Wellbore Permit | | | Permit #: | 19970049 | Expiration Date: | 1/22/1998 | | Proposed Depth/Form: | 1454 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | SPANISH PEAKS | Unit Number: | COC 57890X | | Formation And Spacing: | Code: VRMJ , Formation: VERMEJO COAL , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/26/1997 | | Spud Date: | 3/11/1997 | Spud Date Is: | ACTUAL | | Measured TD: | 1377 ft. | Measured PB depth: | 1328 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | GAMMA RAY, CDL, CALIPER, CBL | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 476 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 115, Top: 0 ft., Bottom: 476 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 1364 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 156, Top: 100 ft., Bottom: 1377 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | 970 ft. | N | N | | VERMEJO COAL | 970 ft. | 1200 ft. | N | N | | TRINIDAD | 1200 ft. | 1360 ft. | N | N | | PIERRE | 1360 ft. | | N | N |
Formation VRMJ Formation Classification: GW Status: PR - 3/1/2019 Interval Top: 970 ft. Interval Bottom: 1146 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 5/20/1997 | Choke Size: | 0.421 in. | | Formation Name: | VERMEJO COAL | Commingled: | No | | Production Method: | PUMPING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 3/26/1997 | | Treatment Summary: | SEE SCANNED DOCUMENT # 00609738 |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 1217 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/3/1997 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 129 | | BTU_GAS | 1002 | | CALC_BBLS_H2O | 129 | | CALC_MCF_GAS | 349 | | CASING_PRESS | 66 | | MCF_GAS | 349 |
| | Perforation Data: | | Interval Top: | 970 ft. | # Of Holes: | 168 | | Interval Bottom: | 1146 ft. | Hole Size: | 0.48 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | Y | Production Period 10/2024 - 09/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 691 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 0.326 |
| Average MCFE per Day | 1.893 |
| Federal Financial Assurance | i | |
|
|