Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06347
Well Classification: CBM Status: PR - 5/9/2008
Well Name/No:APACHE CANYON #19-12
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:26922
Facility Status:PRStatus Date5/9/2008
FacilityID:217569LocationID:307380
County:LAS ANIMAS #071Location:NWSW 19 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7480 ft.
Planned Location:1429FSL  778 FWLLat/Long: 37.066414 / -104.934761Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.066390 / -104.934810Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 5/9/2008             Measured TD: 1640 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 5/9/2008
Wellbore Permit
Permit #:960475 Expiration Date:6/12/1997
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: VRMJ , Formation: VERMEJO COAL , Order: 0 , Unit Acreage: 160, Drill Unit: SW4

Wellbore Completed
Completion Date:N/A
Measured TD:1640 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 218 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: , Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 6.5 in., Size: 4.5 in., Top: 0 ft., Depth: 1630 ft., Weight: 9.5 , Citings Type: ACTUAL
Cement:Sacks: 260, Top: 1180 ft., Bottom: 1630 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
VERMEJO COAL1248 ft.

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 5/9/2008                  Interval Top: 1266 ft.    Interval Bottom: 1491 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:3/18/2007Choke Size: 
Formation Name:VERMEJO COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/18/2007
Treatment Summary:ACIDIZED W/1000 GALS 7-1/2% ACID. FRAC'D W/76,000# 20/40 & 9,996 GALS 30# GELLED H20 & 261,700 SCF N2 FOAM.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/18/2007Test Method:PPG
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 100
BTU_GAS 1005
CALC_BBLS_H2O 100
CASING_PRESS 1
TUBING_PRESS 0
Perforation Data:
Interval Top:1266 ft.# Of Holes:96
Interval Bottom:1491 ft.Hole Size:

Formation RTON                     Formation Classification:  GW                     Status:  CM - 9/9/2007                  Interval Top: 370 ft.    Interval Bottom: 1054 ft.

 Completed Information for Formation RATON COAL
1st Production Date:9/6/2007Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:8/23/2007
Treatment Summary:ACIDIZED W/3000 GALS 15% HCI ACID. FRAC'D W/70,272 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 17,100# 16/30 SAND AND 391,637# 12/20 ARIZONA SAND.
Tubing Size:2.375 in.Tubing Setting Depth:1536 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/9/2007Test Method:PUMPING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 46
BTU_GAS 1003
CALC_BBLS_H2O 46
CASING_PRESS 4
GRAVITY_OIL 1
TUBING_PRESS 23
Perforation Data:
Interval Top:370 ft.# Of Holes:57
Interval Bottom:1054 ft.Hole Size:0.37 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 9/6/2007

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:9/6/2007Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
April 2024 - March 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)19455
GOR
GOR DeterminationMCFE
Average BOE per Day9.168
Average MCFE per Day53.182

 Federal Financial Assurance  i 

 Tribal Well  i No