|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 2/1/2021 Measured TD: 2560 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 2/1/2021 | Wellbore Permit | | Permit #: | 940873 | Expiration Date: | 1/15/1995 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: 0 , Unit Acreage: 160, Drill Unit: SE4 |
| | |
Wellbore Completed | Completion Date: | 8/5/1996 | Measured TD: | 2560 ft. | Measured PB depth: | 1700 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 226 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2560 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 260 ft. | | | | VERMEJO COAL | 2062 ft. | | | | TRINIDAD | 2383 ft. | | | |
Formation RTON Formation Classification: GW Status: PR - 2/1/2021 Interval Top: 526 ft. Interval Bottom: 1511 ft. Completed Information for Formation RATON COAL | 1st Production Date: | 11/1/2003 | Choke Size: | | Formation Name: | RATON COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | FRACTURE STIMULATION | Treatment Date: | 8/4/2018 | Treatment End Date: | 8/29/2018 | Treatment Summary: | Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1509' - 11', 1444' - 45' and 1416' - 18', Stage 2 - 1272' - 77', Stage 3 - 1255' - 58', Stage 4 - 1120' - 24', 946' - 48', and 908' - 10', Stage 5 - 892' - 95' and 703' - 05', Stage 6 - 634' - 38' and 526' - 29' (28' net or 84 holes). A total of 207,060 gallons of produced water with 74,718 gallons of x-link and 107,482 lbs of sand were pumped. All six stages were pumped according to design.
The ECWS #33 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production. | Total fluid used in treatment (bbls): | 6709 | Max pressure during treatment (psi): | 3760 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.30 | Type Of gas: | | Number Of staged intervals: | 6 | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.31 | Recycled water used in treatment (bbls): | 6709 | Total flowback volume recovered (bbls): | 2363 | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | Total proppant used (lbs): | 107482 | Green completions techniques utilized: | Yes | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 8/22/2008 | Treatment Summary: | Status Change Only |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 9/4/2018 | Test Method: | Pumping | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
BBLS_H2O | 69 | BTU_GAS | 991 | CALC_BBLS_H2O | 69 | CALC_MCF_GAS | 16 | CASING_PRESS | 2 | MCF_GAS | 16 |
| Perforation Data: | Interval Top: | 526 ft. | # Of Holes: | 84 | Interval Bottom: | 1511 ft. | Hole Size: | 0.375 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 23743 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 11.217 |
Average MCFE per Day | 65.051 |
Federal Financial Assurance | i | |
|
|