Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06200
Well Classification: CBM Status: PR - 2/1/2021
Well Name/No:HILL RANCH #28-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:26926
Facility Status:PRStatus Date2/1/2021
FacilityID:217423LocationID:312086
County:LAS ANIMAS #071Location:NWSE 28 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:8024 ft.
Planned Location:1940FSL  1459 FELLat/Long: 37.053384 / -104.889139Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.053330 / -104.889080Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 2/1/2021             Measured TD: 2560 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 2/1/2021
Wellbore Permit
Permit #:940873 Expiration Date:1/15/1995
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: 0 , Unit Acreage: 160, Drill Unit: SE4

Wellbore Completed
Completion Date:8/5/1996
Measured TD:2560 ft.Measured PB depth:1700 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 226 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2560 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL260 ft.
VERMEJO COAL2062 ft.
TRINIDAD2383 ft.

Formation RTON                     Formation Classification:  GW                     Status:  PR - 2/1/2021                  Interval Top: 526 ft.    Interval Bottom: 1511 ft.

 Completed Information for Formation RATON COAL
1st Production Date:11/1/2003Choke Size: 
Formation Name:RATON COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/4/2018Treatment End Date:8/29/2018
Treatment Summary:Perforate Raton Coal intervals with 3 SPF and 120 degree phasing listed by stage and fraced Raton Coal intervals including Stage 1 - 1509' - 11', 1444' - 45' and 1416' - 18', Stage 2 - 1272' - 77', Stage 3 - 1255' - 58', Stage 4 - 1120' - 24', 946' - 48', and 908' - 10', Stage 5 - 892' - 95' and 703' - 05', Stage 6 - 634' - 38' and 526' - 29' (28' net or 84 holes). A total of 207,060 gallons of produced water with 74,718 gallons of x-link and 107,482 lbs of sand were pumped. All six stages were pumped according to design. The ECWS #33 rigged down and moved to next location. Well was cleaned out to PBTD and returned to production.
Total fluid used in treatment (bbls):6709Max pressure during treatment (psi):3760
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.31
Recycled water used in treatment (bbls):6709Total flowback volume recovered (bbls):2363
Fresh water used in treatment (bbls):0Disposition method For flowback:DISPOSAL
Total proppant used (lbs):107482Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:8/22/2008
Treatment Summary:Status Change Only
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/4/2018Test Method:Pumping
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 69
BTU_GAS 991
CALC_BBLS_H2O 69
CALC_MCF_GAS 16
CASING_PRESS 2
MCF_GAS 16
Perforation Data:
Interval Top:526 ft.# Of Holes:84
Interval Bottom:1511 ft.Hole Size:0.375 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)23743
GOR
GOR DeterminationMCFE
Average BOE per Day11.217
Average MCFE per Day65.051

 Federal Financial Assurance  i 

 Tribal Well  i No