Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06144
Well Classification: CBM Status: PR - 4/20/2010
Well Name/No:APACHE CANYON #10-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date4/20/2010
FacilityID:217368LocationID:307288
County:LAS ANIMAS #071Location:SWNE 10 34S68W 6
Field:PURGATOIRE RIVER - #70830Elevation:8600 ft.
Planned Location:2100FNL  1882 FELLat/Long: 37.099923 / -104.980322Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.099910 / -104.980350Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 4/20/2010             Measured TD: 2647 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 4/20/2010
Wellbore Permit
Permit #:19890709 Expiration Date:12/26/1989
Proposed Depth/Form:2700 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit: ALL

Wellbore Completed
Completion Date:1/5/1990
Spud Date:10/5/1989Spud Date Is:ACTUAL
Measured TD:2647 ft.Measured PB depth:2585 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LDT/CNT; DIL/SFL/GR; CEL; MICROLOG; NGT
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 205 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2647 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 420, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL2116 ft.NN
TRINIDAD2414 ft.NN
PIERRE2520 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 4/20/2010                 Interval Top: 2132 ft.    Interval Bottom: 2411 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:1/8/1990Choke Size: 
Formation Name:VERMEJO COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/8/2010
Treatment Summary:ACIDIZED W/1,900 GALS 15% HCI ACID, REFRAC'D W/150,357 GALS 20# DELTA 140 W/SANDWEDGE OS CARRYING 14,210# 16/30 BRADY SD & 252,247# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 300
BBLS_OIL 0
CALC_BBLS_H2O 300
CALC_BBLS_OIL 0
CALC_MCF_GAS 7
CASING_PRESS 5
MCF_GAS 7
Perforation Data:
Interval Top:2132 ft.# Of Holes:233
Interval Bottom:2411 ft.Hole Size:0.7 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  PR - 4/20/2010                 Interval Top: 703 ft.    Interval Bottom: 2411 ft.

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:3/29/2010Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:1/5/1990
Treatment Summary:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/20/2010Test Method:FLOWING
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 0
BBLS_OIL 0
BTU_GAS 989
CALC_BBLS_H2O 0
CALC_BBLS_OIL 0
CALC_GOR 0
CALC_MCF_GAS 25
CASING_PRESS 1
MCF_GAS 25
TUBING_PRESS 0
Perforation Data:
Interval Top:703 ft.# Of Holes:319
Interval Bottom:2411 ft.Hole Size:0.45 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 4/20/2010                 Interval Top: 703 ft.    Interval Bottom: 1553 ft.

 Completed Information for Formation RATON COAL
1st Production Date:3/29/2010Choke Size: 
Formation Name:RATON COALCommingled:Yes
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:3/15/2010
Treatment Summary:ACIDIZED W/ 4,300 GALS 15% HCI ACID FRAC'D W/156,911 GALS DELTA 140 W/SANDWEDGE OS CARRYING 26,074# 16/30 BRADY SD & 291,108# 12/20 BRADY SD.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RTON.
Perforation Data:
Interval Top:703 ft.# Of Holes:86
Interval Bottom:1553 ft.Hole Size:0.45 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
May 2024 - April 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)17143
GOR
GOR DeterminationMCFE
Average BOE per Day8.096
Average MCFE per Day46.967

 Federal Financial Assurance  i 

 Tribal Well  i No