|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 12/22/1994 Measured TD: 2675 ft. Vertical TD: 0 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 12/22/1994 | Wellbore Permit | | Permit #: | 890684 | Expiration Date: | 12/20/1989 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: RTON , Formation: RATON COAL , Order: 0 , Unit Acreage: 640, Drill Unit: ALL |
| | |
Wellbore Completed | Completion Date: | 12/15/1989 | Measured TD: | 2675 ft. | Measured PB depth: | 2585 ft. | True Vertical TD: | 0 ft. | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 192 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 360, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 2670 ft., Weight: , Citings Type: HISTORICAL | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | RATON COAL | 344 ft. | | | | VERMEJO COAL | 2152 ft. | | | | TRINIDAD | 2439 ft. | | | | PIERRE | 2564 ft. | | | |
Formation RTON Formation Classification: GW Status: PR - 12/27/1989 Interval Top: 344 ft. Completed Information for Formation RATON COAL | 1st Production Date: | N/A | Choke Size: | 0.000 in. | Formation Name: | RATON COAL | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation RTON. |
| No Perforation Data was found for formation RTON. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 13832 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 6.534 |
Average MCFE per Day | 37.879 |
Federal Financial Assurance | i | |
|
|