Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-071-06135
Well Classification: CBM Status: SI - 6/1/2023
Well Name/No:APACHE CANYON #5-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:OGRIS OPERATING LLC - 10758
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date6/1/2023
FacilityID:217359LocationID:312008
County:LAS ANIMAS #071Location:NESE 5 34S67W 6
Field:PURGATOIRE RIVER - #70830Elevation:7390 ft.
Planned Location:1939FSL  292 FELLat/Long: 37.111303 / -104.903160Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 37.111290 / -104.903210Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: SI - 6/1/2023             Measured TD: 1865 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        SI - 6/1/2023
Wellbore Permit
Permit #:19890678 Expiration Date:12/20/1989
Proposed Depth/Form:2400 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: RTON , Formation: RATON COAL , Order: , Unit Acreage: 640, Drill Unit:

Wellbore Completed
Completion Date:2/21/1990
Spud Date:10/12/1989Spud Date Is:ACTUAL
Measured TD:1865 ft.Measured PB depth:930 ft.
True Vertical TD:True Vertical PB depth:
Log Types:LDT/CNT/ML, DIL/SFL/GR, CBL
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 0 ft., Depth: 212 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1865 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
RATON COAL0 ft.NN
VERMEJO COAL1350 ft.NN
TRINIDAD1738 ft.NN
PIERRE1850 ft.NN

Formation VRMJ                     Formation Classification:  GW                     Status:  CM - 3/30/2006                 Interval Top: 1468 ft.    Interval Bottom: 1720 ft.

 Completed Information for Formation VERMEJO COAL
1st Production Date:2/21/1990Choke Size: 
Formation Name:VERMEJO COALCommingled:
Production Method:ROD PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:2/21/1990
Treatment Summary:1646' - 1720' FRAC W/ 70,000 GAL 30# XL; 234,000# 12/16 SAND
Tubing Size:2.875 in.Tubing Setting Depth:1663 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:3/22/1990Test Method:ROD PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 1262
CALC_BBLS_H2O 1262
CALC_MCF_GAS 3
CASING_PRESS 5
MCF_GAS 3
Perforation Data:
Interval Top:1468 ft.# Of Holes:181
Interval Bottom:1720 ft.Hole Size:0.7 in.

Formation RTON                     Formation Classification:  GW                     Status:  CM - 3/30/2006                 Interval Top: 591 ft.    Interval Bottom: 668 ft.

 Completed Information for Formation RATON COAL
1st Production Date:4/10/1996Choke Size: 
Formation Name:RATON COALCommingled:
Production Method:BEAM PUMP
Open Hole Completion:
Formation Treatment
Treatment Date:2/21/1990
Treatment Summary:591' - 668' 300 GAL 15% ACID; 500 BW & 25,900# 20/40 SAND & 7,000# 10/20 SAND.
Tubing Size:2.875 in.Tubing Setting Depth:1662 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/8/1996Test Method:BEAM PUMP
Hours Tested:24Gas Type:COAL GAS
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 10
CALC_BBLS_H2O 10
CALC_MCF_GAS 100
MCF_GAS 100
Perforation Data:
Interval Top:591 ft.# Of Holes:31
Interval Bottom:668 ft.Hole Size:0.375 in.

Formation RT-VJ                   Formation Classification:  GW                   Status:  SI - 6/1/2023

 Completed Information for Formation RATON-VERMEJO COALS
1st Production Date:4/10/1996Choke Size: 
Formation Name:RATON-VERMEJO COALSCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation RT-VJ.
No Perforation Data was found for formation RT-VJ.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI )YDefined Inactive
05/31/2023
Low ProducingYProduction Period
02/2024 - 01/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2024 - January 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No