|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 8/11/2011 Measured TD: 2586 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 8/11/2011 | | Wellbore Permit | | | Permit #: | 19890493 | Expiration Date: | 10/9/1989 | | Proposed Depth/Form: | 2300 ft. | | Surface Mineral Owner Same: | Yes | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: RT-VJ , Formation: RATON-VERMEJO COALS , Order: , Unit Acreage: 640, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 1/22/1990 | | Spud Date: | 8/31/1989 | Spud Date Is: | ACTUAL | | Measured TD: | 2586 ft. | Measured PB depth: | 2539 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | LDT/CNTG; NGT; ML; DIL/SFL; GST/GR; CEL; CBL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 249 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.875 in., Size: 5.5 in., Top: 0 ft., Depth: 2585 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 132, Top: 2060 ft., Bottom: , Determination Method: | | Casing: | String Type: 2ND, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 318, Top: 230 ft., Bottom: 1765 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | RATON COAL | 0 ft. | | Y | N | | VERMEJO COAL | 2068 ft. | | Y | N | | TRINIDAD | 2368 ft. | | Y | N | | PIERRE | 2480 ft. | | Y | N |
Formation VRMJ Formation Classification: GW Status: CM - 12/8/1995 Interval Top: 2073 ft. Interval Bottom: 2363 ft.| Completed Information for Formation VERMEJO COAL | | 1st Production Date: | 1/22/1990 | Choke Size: | | | Formation Name: | VERMEJO COAL | Commingled: | | | Production Method: | ROD PUMP | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 1/22/1990 | | Treatment Summary: | 2073'-2155' A W/ 400 GAL 15% HCL, F W/ 88,400 GALS & 275,000# 12/20 COLO SILICA 35# BORATE GEL 2296'-2363' A W/ 2000 GAL 15% HCL, F W/ 82,500 GAL & 120,000# 12/20 COLO SILICA 35# BORATE X-LINK |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2218 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/20/1990 | Test Method: | | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | VENTED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 279 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 279 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 96 | | CASING_PRESS | 5 | | MCF_GAS | 96 |
| | Perforation Data: | | Interval Top: | 2073 ft. | # Of Holes: | 217 | | Interval Bottom: | 2363 ft. | Hole Size: | 0.7 in. |
|
Formation RT-VJ Formation Classification: GW Status: PR - 8/11/2011 Interval Top: 707 ft. Interval Bottom: 2310 ft.| Completed Information for Formation RATON-VERMEJO COALS | | 1st Production Date: | 8/8/2011 | Choke Size: | | | Formation Name: | RATON-VERMEJO COALS | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 2309 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 8/11/2011 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 36 | | BTU_GAS | 984 | | CALC_BBLS_H2O | 36 | | CALC_MCF_GAS | 50 | | CASING_PRESS | 33 | | MCF_GAS | 50 |
| | Perforation Data: | | Interval Top: | 707 ft. | # Of Holes: | 293 | | Interval Bottom: | 2310 ft. | Hole Size: | 0.42 in. |
|
Formation RTON Formation Classification: GW Status: CM - 9/9/2011 Interval Top: 707 ft. Interval Bottom: 1423 ft.| Completed Information for Formation RATON COAL | | 1st Production Date: | 8/8/2011 | Choke Size: | | | Formation Name: | RATON COAL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 7/13/2011 | | Treatment Summary: | Acidized w/3,500 gals 15% HCl acid. Frac'd w/98,454 gals 20# Delta 140 w/Sandwedge OS carrying 335,300# 16/30 Nebraska sd.
|
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation RTON. |
| | Perforation Data: | | Interval Top: | 707 ft. | # Of Holes: | 116 | | Interval Bottom: | 1423 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 16733 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 7.903 |
| Average MCFE per Day | 45.839 |
| Federal Financial Assurance | i | |
|
|