Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-069-06525
Well Classification: OW Status: PR - 2/7/2022
Well Name/No:JODSTER SOUTH #25-1HZ
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:KERR MCGEE OIL & GAS ONSHORE LP - 47120
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/7/2022
FacilityID:465734LocationID:465709
County:LARIMER #069Location:SENE 25 5N68W 6
Field:WATTENBERG - #90750Elevation:4861 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:2197FNL  704 FELLat/Long: 40.372011 / -104.947732Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.372013 / -104.947731Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/4/2021
End Date: 1/14/2021
Reported: 1/25/2021
Days to report: 11
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/7/2022             Measured TD: 17656 ft.    Vertical TD: 6956 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/7/2022
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:7/2/2021
Proposed Top PZ Location:Sec:30 Twp: 5N 67W Footage: 2510 FSL  75 FWL
Bottom Hole Location:Sec:29 Twp: 5N 67W Footage: 2548 FSL  160 FEL
Proposed Depth/Form:17664 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 407-2776 , Unit Acreage: 1920, Drill Unit: SEC 25,29,30:All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 80 ft., Weight: 36.94 , Citings Type: PLANNED
Cement:Sacks: 64, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 590, Top: 0 ft., Bottom: 1500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17654 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 2093, Top: , Bottom: 17654 ft.

Wellbore Completed
Completion Date:10/11/2019
Spud Date:8/10/2019Spud Date Is:ACTUAL
Measured TD:17656 ft.Measured PB depth:17630 ft.
True Vertical TD:6956 ft.True Vertical PB depth:6956 ft.
Top PZ Location:Sec:30 Twp: 5N 67WFootage: 2502 FSL  557 FWL
Bottom Hole Location:Sec:29 Twp: 5N 67WFootage: 2550 FSL  161 FEL
Log Types:CBL, MWD/LWD. (GR/OHL in API 069-06507 ).
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 106 ft., Weight: 42 , Citings Type: ACTUAL
Cement:Sacks: 64, Top: 0 ft., Bottom: 106 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1872 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 726, Top: 0 ft., Bottom: 1872 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 17643 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 1601, Top: 2200 ft., Bottom: 17643 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
FOX HILLS1347 ft.
PARKMAN3378 ft.
SUSSEX3880 ft.
SHARON SPRINGS6776 ft.
NIOBRARA6841 ft.

Formation NBRR                     Formation Classification:  OW                     Status:  PR - 2/18/2021                 Interval Top: 7864 ft.    Interval Bottom: 13109 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/28/2021Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:HYDRAULIC FRACTURING
Treatment Date:1/4/2021Treatment End Date:1/14/2021
Treatment Summary:PERF FROM 7864-13109 24 BBLS 15% HCL ACID; 629 BBLS 20% HCR-7000 WL; 57 BBLS 7.5% HCL ACID; 17,273 BBLS PUMP DOWN; 263,972 BBLS SLICKWATER; 281,955 BBLS TOTAL FLUID. 8,183,493 LBS WHITE 40/70 OTTAWA/ST. PETERS; 8,183,493 LBS TOTAL PROPPANT.
Total fluid used in treatment (bbls):281955Max pressure during treatment (psi):7962
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.30
Type Of gas:Number Of staged intervals:37
Total acid used in treatment (bbls):710Min frac gradient (psi/ft):0.96
Recycled water used in treatment (bbls):750Total flowback volume recovered (bbls):332
Fresh water used in treatment (bbls):280495Disposition method For flowback:RECYCLE
Total proppant used (lbs):8183493Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 238
BBLS_OIL 107
BTU_GAS 1258
CALC_BBLS_H2O 238
CALC_BBLS_OIL 107
CALC_GOR 1692
CALC_MCF_GAS 181
CASING_PRESS 2400
GRAVITY_OIL 1258
MCF_GAS 181
TUBING_PRESS 1600
Perforation Data:
Interval Top:7864 ft.# Of Holes:312
Interval Bottom:13109 ft.Hole Size:0.44 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
January 2025 - December 2025i
Total Oil Produced (Barrels)9481
Total Gas Produced (MCF)86720
GOR9146
GOR DeterminationBOE
Average BOE per Day66.988
Average MCFE per Day388.510

 Federal Financial Assurance  i 

 Tribal Well  i No