|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PA - 6/29/2020 Measured TD: 8168 ft. Vertical TD: 7826 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PA - 6/29/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/14/2015 | | Proposed Top PZ Location: | Sec:12 Twp: 5N 68W | Footage: 1320 FNL 1357 FEL | | Bottom Hole Location: | Sec:12 Twp: 5N 68W | Footage: 1319 FNL 1358 FEL | | Proposed Depth/Form: | 8168 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 160, Drill Unit: NE/4 | | Formation And Spacing: | Code: NB-CD , Formation: NIOBRARA-CODELL , Order: 407 , Unit Acreage: 160, Drill Unit: NE/4 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 683 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 683 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8153 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1242, Top: 1000 ft., Bottom: 8153 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/29/2010 | | Spud Date: | 8/23/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 8168 ft. | Measured PB depth: | 4262 ft. | | True Vertical TD: | 7826 ft. | True Vertical PB depth: | 4007 ft. | | Top PZ Location: | Sec:12 Twp: 5N 68W | Footage: 1320 FNL 1357 FEL | | Bottom Hole Location: | Sec:12 Twp: 5N 68W | Footage: 1319 FNL 1358 FEL | | Log Types: | Preliminary Form 5 | | Log Types: | CBL; NO OPEN HOLE LOGS | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 683 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 683 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 8153 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1242, Top: 1000 ft., Bottom: 8153 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: , Depth: , Bottom: , Sacks: , Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | SUSSEX | 4373 ft. | | | | | NIOBRARA | 7225 ft. | | | | | J SAND | 8000 ft. | | | |
Formation JSND Formation Classification: GW Status: AB - 6/29/2020 Interval Top: 8023 ft. Interval Bottom: 8058 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 6/27/2013 | Treatment End Date: | N/A | | Treatment Summary: | SET CIBP AT 7950' TO TA JSND AND PRODUCE NB-CD. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 11/22/2010 | | Treatment Summary: | PERF JSND 8023-8058 HOLES 66 SIZE .4
Frac J-Sand down 4-1/2" Csg w/ 500 gal 15% HCl & 140,111 gal Slickwater w/ 58,200# 40/70, 4,000# SB Excel.
Broke @ 4,870 psi @ 4.6 bpm. ATP=5,043 psi; MTP=5,333 psi; ATR=33.4 bpm; ISDP=3,826 psi |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 1 | | BTU_GAS | 1275 | | CALC_BBLS_OIL | 1 | | CALC_GOR | 90000 | | CALC_MCF_GAS | 90 | | CASING_PRESS | 1536 | | GRAVITY_OIL | 44 | | MCF_GAS | 90 | | TUBING_PRESS | 1000 |
| | Perforation Data: | | Interval Top: | 8023 ft. | # Of Holes: | 66 | | Interval Bottom: | 8058 ft. | Hole Size: | 0.4 in. |
|
Formation CODL Formation Classification: GW Status: CM - 6/6/2016 Interval Top: 7562 ft. Interval Bottom: 7577 ft.| Completed Information for Formation CODELL | | 1st Production Date: | 9/18/2013 | Choke Size: | | | Formation Name: | CODELL | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/25/2013 | Treatment End Date: | 7/25/2013 | | Treatment Summary: | 4745 BBL SLICKWATER, 4745 BBL TOTAL FLUID.
150320# 40/70 SAND, 4000# 20/40 SAND, 154320# TOTAL SAND.
| | Total fluid used in treatment (bbls): | 4745 | Max pressure during treatment (psi): | 5094 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.82 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 430 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 154320 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation CODL. |
| | Perforation Data: | | Interval Top: | 7562 ft. | # Of Holes: | 60 | | Interval Bottom: | 7577 ft. | Hole Size: | 0.38 in. |
|
Formation NB-CD Formation Classification: GW Status: AB - 6/29/2020 Interval Top: 7247 ft. Interval Bottom: 7577 ft.| Completed Information for Formation NIOBRARA-CODELL | | 1st Production Date: | 9/18/2013 | Choke Size: | | | Formation Name: | NIOBRARA-CODELL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 10/8/2013 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_OIL | 19 | | BTU_GAS | 1296 | | CALC_BBLS_OIL | 19 | | CALC_GOR | 53 | | CALC_MCF_GAS | 1 | | CASING_PRESS | 288 | | GRAVITY_OIL | 48 | | MCF_GAS | 1 |
| | Perforation Data: | | Interval Top: | 7247 ft. | # Of Holes: | 126 | | Interval Bottom: | 7577 ft. | Hole Size: | 0.42 in. |
|
Formation NBRR Formation Classification: OG Status: CM - 6/6/2016 Interval Top: 7247 ft. Interval Bottom: 7444 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 9/18/2013 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | Yes | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 7/25/2013 | Treatment End Date: | 7/25/2013 | | Treatment Summary: | 5983 BBL SLICKWATER, 6 BBL ACID, 5989 BBL TOTAL FLUID.
200340# 40/70 SAND, 4000# 20/40 SAND, 204340# TOTAL SAND. | | Total fluid used in treatment (bbls): | 5989 | Max pressure during treatment (psi): | 4942 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.30 | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 6 | Min frac gradient (psi/ft): | 0.84 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 430 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 204340 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation NBRR. |
| | Perforation Data: | | Interval Top: | 7247 ft. | # Of Holes: | 66 | | Interval Bottom: | 7444 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | Y | 06/29/2020 |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|