|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2022 Measured TD: 6465 ft. Vertical TD: 6320 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2022 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/21/2014 | | Proposed Top PZ Location: | Sec:18 Twp: 8N 68W | Footage: 1417 FSL 702 FEL | | Bottom Hole Location: | Sec:18 Twp: 8N 68W | Footage: 2010 FSL 640 FEL | | Proposed Depth/Form: | 6507 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: LYNS , Formation: LYONS , Order: 84-1 , Unit Acreage: 40, Drill Unit: NESE | | Formation And Spacing: | Code: MDDY , Formation: MUDDY , Order: 84-2 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: UNSPACED , Unit Acreage: 80, Drill Unit: E2SE4 | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 750 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6500 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 750, Top: 1200 ft., Bottom: 6500 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/17/2010 | | Spud Date: | 6/6/2010 | Spud Date Is: | ACTUAL | | Measured TD: | 6465 ft. | Measured PB depth: | 6398 ft. | | True Vertical TD: | 6320 ft. | True Vertical PB depth: | 6250 ft. | | Top PZ Location: | Sec:18 Twp: 8N 68W | Footage: 1417 FNL 702 FEL | | Bottom Hole Location: | Sec:18 Twp: 8N 68W | Footage: 2054 FSL 656 FEL | | Log Types: | NO NEW LOGS RUN. | | Log Types: | CBL, DEN/NEU/ACTR | | Casing: | String Type: SURF, Hole Size: 11 in., Size: 8.625 in., Top: 0 ft., Depth: 750 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 255, Top: 0 ft., Bottom: 750 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6442 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 1070, Top: 2380 ft., Bottom: 6442 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | HYGIENE | 1408 ft. | | | | | NIOBRARA | 3954 ft. | | | | | TIMPAS | 4286 ft. | | | | | CODELL | 4308 ft. | | | | | GREENHORN | 4391 ft. | | | | | BENTONITE | 4490 ft. | | N | N | | GRANEROS | 4600 ft. | | | | | MUDDY | 4841 ft. | | | | | DAKOTA | 5066 ft. | | | | | MORRISON | 5080 ft. | | | | | SUNDANCE | 5250 ft. | | | | | LYKINS | 5430 ft. | | N | N | | ENTRADA | 5488 ft. | | | | | LYONS | 6312 ft. | | | |
Formation LYNS Formation Classification: OW Status: AB - 5/12/2011 Interval Top: 6332 ft. Interval Bottom: 6355 ft.| Completed Information for Formation LYONS | | 1st Production Date: | 8/28/2010 | Choke Size: | | | Formation Name: | LYONS | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 8/20/2010 | | Treatment Summary: | PUMPED 8455 GALLONS LINEAR GEL AND 9421 GALLONS LIGHTNING 26 PAD, 21,470 CLEAN GALLONS LIGHTNING 26 WITH PROPPANT 49,660 LBS. 16/30 OTTAWA WHITE SAND AND 35,980 LBS SUPER LC SAND. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6333 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/25/2010 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 90 | | BBLS_OIL | 8 | | CALC_BBLS_H2O | 90 | | CALC_BBLS_OIL | 8 | | CALC_GOR | 0 | | CALC_MCF_GAS | 0 | | CASING_PRESS | 10 | | MCF_GAS | 0 | | TUBING_PRESS | 10 |
| | Perforation Data: | | Interval Top: | 6332 ft. | # Of Holes: | 69 | | Interval Bottom: | 6355 ft. | Hole Size: | 0.42 in. |
|
Formation MDDY Formation Classification: OW Status: PR - 12/1/2022 Interval Top: 4842 ft. Interval Bottom: 4872 ft.| Completed Information for Formation MUDDY | | 1st Production Date: | 4/6/2011 | Choke Size: | | | Formation Name: | MUDDY | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 3/23/2011 | | Treatment Summary: | PERFORATION INTERVALS: 4842-4850 (16 HOLES): 4860-4872 (24 HOLES). PUMPED 184 BBLS LINEAR GEL, 1565 BBLS OF 20 LB XLINK GEL; 116 BLS LINEAR GEL FLUSH; WITH PROPPANT (193,610 LBS OF 16/30 TEXAS GOLD AND 14,400 LBS OF 20/40 SB XL SAND). 1864 BBLS TO RECOVER. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 4939 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/5/2011 | Test Method: | PUMPING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 79 | | BBLS_OIL | 65 | | CALC_BBLS_H2O | 79 | | CALC_BBLS_OIL | 65 | | CASING_PRESS | 10 | | GRAVITY_OIL | 35 | | TUBING_PRESS | 10 |
| | Perforation Data: | | Interval Top: | 4842 ft. | # Of Holes: | 40 | | Interval Bottom: | 4872 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|