|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: SI - 1/1/2024 Measured TD: 4940 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW SI - 1/1/2024 | | Wellbore Permit | | | Permit #: | 19450000 | Expiration Date: | 6/3/1945 | | Proposed Depth/Form: | 4711 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | MUDDY SANDSTONE | Unit Number: | | | Formation And Spacing: | Code: MDDY , Formation: MUDDY , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 12/20/1989 | | Spud Date: | 12/28/1944 | Spud Date Is: | ACTUAL | | Measured TD: | 4940 ft. | Measured PB depth: | 4810 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Log Types: | ELECTRICAL | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 293 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 150, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 4712 ft., Weight: 20,24 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST LINER, Hole Size: 0 in., Size: 5 in., Top: 4660 ft., Depth: 4937 ft., Weight: 15 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 4790 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | HYGIENE | 1405 ft. | | | | | NIOBRARA | 3860 ft. | | | | | CODELL | 4211 ft. | | | | | MUDDY | 4711 ft. | | | | | DAKOTA | 4927 ft. | | | Y |
Formation DKTA Formation Classification: GW Status: AB - 11/19/1989 Interval Top: 4930 ft. Interval Bottom: 4936 ft.| Completed Information for Formation DAKOTA | | 1st Production Date: | 9/21/1954 | Choke Size: | | | Formation Name: | DAKOTA | Commingled: | | | Production Method: | FLOWING | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/20/1989 | | Treatment Summary: | FRAC'D W/1900# & 5,000 GAL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/21/1954 | Test Method: | FLOWING | | Hours Tested: | 10 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 93 |
| | Perforation Data: | | Interval Top: | 4930 ft. | # Of Holes: | | | Interval Bottom: | 4936 ft. | Hole Size: | |
|
Formation MDDY Formation Classification: GW Status: SI - 1/1/2024 Interval Top: 4715 ft. Interval Bottom: 4730 ft.| Completed Information for Formation MUDDY | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | MUDDY | Commingled: | | | Production Method: | INJECTION | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/20/1989 | | Treatment Summary: | 1949 - SHOT WITH 71 QTS SOLID NITRO GLYCERIN, 1961 - ACIDIZED W/500 GAL 28%, FRAC'D W/10,000# & 10,000 GAL |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation MDDY. |
| | Perforation Data: | | Interval Top: | 4715 ft. | # Of Holes: | | | Interval Bottom: | 4730 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Defined Inactive 11/30/2023 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|