|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2022 Measured TD: 4624 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2022 | | Wellbore Permit | | | Permit #: | 19260000 | Expiration Date: | 2/14/1927 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | MUDDY SANDSTONE | Unit Number: | |
| | |
| Wellbore Completed | | Completion Date: | 7/1/1928 | | Spud Date: | 10/14/1926 | Spud Date Is: | ACTUAL | | Measured TD: | 4624 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: 20 in., Top: 0 ft., Depth: 77 ft., Weight: 90 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: SURF, Hole Size: , Size: 15.5 in., Top: , Depth: 425 ft., Weight: 70 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 12.5 in., Top: 0 ft., Depth: 1381 ft., Weight: 50 , Citings Type: ACTUAL | | Cement: | Sacks: 125, Top: , Bottom: , Determination Method: | | Casing: | String Type: 2ND, Hole Size: , Size: 10 in., Top: 0 ft., Depth: 2250 ft., Weight: 45 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: 3RD, Hole Size: , Size: 8.25 in., Top: , Depth: 3712 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST LINER, Hole Size: , Size: 6.25 in., Top: , Depth: 4584 ft., Weight: 26 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: 2ND LINER, Hole Size: , Size: 4.75 in., Top: , Depth: 4624 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: |
Formation MDDY Formation Classification: OW Status: PR - 12/1/2022| Completed Information for Formation MUDDY | | 1st Production Date: | 7/1/1928 | Choke Size: | | | Formation Name: | MUDDY | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 301 | | MCF_GAS | 46 |
| | No Perforation Data was found for formation MDDY. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|