|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 12/1/2020 Measured TD: 3810 ft. Vertical TD: 3460 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 12/1/2020 | | Wellbore Permit | DIRECTIONAL | | Permit #: | 20087380 | Expiration Date: | 1/21/2010 | | Proposed Top PZ Location: | Sec: Twp: | Footage: 733 FSL 1869 FWL | | Bottom Hole Location: | Sec:23 Twp: 33N 9W | Footage: 688 FSL 1912 FWL | | Proposed Depth/Form: | 3746 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-190 , Unit Acreage: 320, Drill Unit: W2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 350 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 350 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 3746 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 357, Top: 0 ft., Bottom: 3746 ft. | | Casing: | String Type: 2ND, Hole Size: , Size: , Top: , Depth: , Weight: , Citings Type: PLANNED | | Cement: | Sacks: 134, Top: 0 ft., Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 8/9/2009 | | Spud Date: | 8/6/2009 | Spud Date Is: | ACTUAL | | Measured TD: | 3810 ft. | Measured PB depth: | 3799 ft. | | True Vertical TD: | 3460 ft. | True Vertical PB depth: | 3449 ft. | | Top PZ Location: | Sec:23 Twp: 33N 9W | Footage: 801 FSL 1785 FWL | | Bottom Hole Location: | Sec:23 Twp: 33n 9w | Footage: 777 FSL 1813 FWL | | Log Types: | | | Log Types: | CBL/RST | | Casing: | String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 24 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Casing: | String Type: SURF, Hole Size: 8.625 in., Size: 12.25 in., Top: 0 ft., Depth: 393 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 300, Top: 0 ft., Bottom: 403 ft., Determination Method: | | Casing: | String Type: 1ST, Hole Size: 5.5 in., Size: 7.875 in., Top: 0 ft., Depth: 3780 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 3799 ft., Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FRUITLAND COAL | 3056 ft. | 3468 ft. | | |
Formation FRLDC Formation Classification: GW Status: PR - 12/1/2020 Interval Top: 3200 ft. Interval Bottom: 3460 ft.| Completed Information for Formation FRUITLAND COAL | | 1st Production Date: | 10/18/2010 | Choke Size: | | | Formation Name: | FRUITLAND COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | Yes |
| | Formation Treatment | | Treatment Date: | 8/5/2010 | | Treatment Summary: | Pumped 5500 gal 15% hcl acid, pumped 2997 gal gel and 195792# 20/40 proppant
SIBHP: 785 @ 3138'. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 3680 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/1/2010 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | COAL GAS | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 35 | | BTU_GAS | 1000 | | CALC_BBLS_H2O | 35 | | CALC_MCF_GAS | 126 | | CASING_PRESS | 87 | | MCF_GAS | 126 | | TUBING_PRESS | 86 |
| | Perforation Data: | | Interval Top: | 3200 ft. | # Of Holes: | 240 | | Interval Bottom: | 3460 ft. | Hole Size: | 0.49 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 55174 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 26.068 |
| Average MCFE per Day | 151.192 |
| Federal Financial Assurance | i | |
|
|