|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2016 Measured TD: Vertical TD: 3215 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2016 | | Wellbore Permit | | | Permit #: | 20040205 | Expiration Date: | 2/12/2005 | | Proposed Depth/Form: | 3100 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-157 , Unit Acreage: 320, Drill Unit: S/2 | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 400 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 400 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 3100 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: 430, Top: 0 ft., Bottom: 3100 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/14/2004 | | Spud Date: | 4/16/2004 | Spud Date Is: | ACTUAL | | Measured TD: | | Measured PB depth: | | | True Vertical TD: | 3215 ft. | True Vertical PB depth: | 3160 ft. | | Log Types: | SDL/DSN;HRI GR/CCL/CBLFROM PBTD 3160'WLM) TO 2400' | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FRUITLAND COAL | 2650 ft. | 3050 ft. | N | N | | PICTURED CLIFFS | 3050 ft. | | N | N |
Formation FRLDC Formation Classification: GW Status: PR - 10/1/2016 Interval Top: 2751 ft. Interval Bottom: 3051 ft.| Completed Information for Formation FRUITLAND COAL | | 1st Production Date: | N/A | Choke Size: | 0.047 in. | | Formation Name: | FRUITLAND COAL | Commingled: | No | | Production Method: | FLOWING | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/14/2004 | | Treatment Summary: | SPOT 300 GAL 15% DI HCI @ 3051'. 2000 GAL 15% HCI ADIC IN 6 SETTINGS. SPEARHEAD FRAC W/ 1000 10% FORMIC ACID & FRAC DN 5-1/2" CSG W/ 95,300 GAL 20# DELTA 140 FRAC FLUID W/SANDWEDGE; 229,356# 20/40 BRADY SAND |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 2836 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 6/17/2004 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 405 | | BBLS_OIL | 0 | | CALC_BBLS_H2O | 405 | | CALC_BBLS_OIL | 0 | | CALC_MCF_GAS | 333 | | CASING_PRESS | 760 | | MCF_GAS | 333 | | TUBING_PRESS | 510 |
| | Perforation Data: | | Interval Top: | 2751 ft. | # Of Holes: | | | Interval Bottom: | 3051 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 87166 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 41.191 |
| Average MCFE per Day | 238.901 |
| Federal Financial Assurance | i | |
|
|