Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-067-08709
Well Classification: CBM Status: PR - 8/1/2020
Well Name/No:HOWARD MANKINS #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SIMCOE LLC - 10749
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/1/2020
FacilityID:263132LocationID:306759
County:LA PLATA #067Location:SENE 10 34N7W N
Field:IGNACIO BLANCO - #38300Elevation:6983 ft.
Planned Location:1625FNL  825 FELLat/Long: 37.231827 / -107.617532Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.231758 / -107.617566Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 8/1/2020             Measured TD: 2255 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 8/1/2020
Wellbore Permit
Permit #:20020536 Expiration Date:3/27/2003
Prop Depth/Form:2255 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number: 
Formation And Spacing:Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-156 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:5/17/2002
Spud Date:4/25/2002Spud Date Is:ACTUAL
Measured TD:2255 ft.Measured PB depth:2137 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage:  FL   FLDepth
Bottom Hole Location:Sec: Twp: Footage:  FL   FLDepth
Log Types:PLAT.EX ARRAY SP/GR CALP.;P.E. TRIP.LDC, NEU LOG
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: , Depth: 475 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 373, Top: , Bottom: 475 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 2246 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 112, Top: , Bottom: 2246 ft., Determination Method:
FormationInterval TopLog BottomCoredDSTs
FRUITLAND COAL1886 ft.NN

Formation FRLDC                   Formation Classification:  CBM                   Status:  PR - 6/21/2022                 Interval Top: 1887 ft.    Interval Bottom: 2084 ft.

 Completed Information for Formation FRUITLAND COAL
1st Production Date:6/27/2002Choke Size: 
Formation Name:FRUITLAND COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/20/2022Treatment End Date:6/21/2022
Treatment Summary:6/20/2022: PUMP 5 BBL FLUSH (0.5% KCL W/ 2 GPT BIOCIDE) TO ESTABLISH INJECTION DOWN TBG X CSG ANNULUS. PUMP 1000 GAL (23.8 BBL) INHIBITED 15% HCL, 5 BBL FLUSH, SOAK ~2 HOURS. MAX PRESSURE OBSERVED DURING TREATMENT 42 PSI; WELL WENT ON VACUUM DURING PUMPING OPERATIONS AT 80 GALLONS TOTAL FLUID PUMPED. PUMP 15 BBL NEUTRALIZATION SLURRY (15 BBL 0.5% KCL W/ 2 GPT BIOCIDE AND 600# SODA ASH), 5 BBL FLUSH, SOAK OVERNIGHT. 6/21/2022: OPERATIONS STARTUP ARTIFICIAL LIFT, RETURNED WELL TO SERVICE.
Total fluid used in treatment (bbls):54Max pressure during treatment (psi):42
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):30Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:5/17/2002
Treatment Summary:PERFED 1887'-1894',-1894',1934'-1943',1983'-2005',2067'-2084 W/4 JSPF.FRACED W/182,802# SD, 86,738.4, AIR 52.50 BPM @ 2261#, ISISP 1,937.
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 23
BTU_GAS 874
CASING_PRESS 192
MCF_GAS 191
TUBING_PRESS 166
Perforation Data:
Interval Top:1887 ft.# Of Holes:220
Interval Bottom:2084 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)68511
GOR
GOR DeterminationMCFE
Average BOE per Day32.276
Average MCFE per Day187.207

 Federal Financial Assurance  i 

 Tribal Well  i No