|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 4/1/2020 Measured TD: 4010 ft. Vertical TD: 4010 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 4/1/2020 | Wellbore Permit | | Permit #: | 19990319 | Expiration Date: | 5/17/2000 | Prop Depth/Form: | 4031 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | INDIAN | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-136 , Unit Acreage: 160, Drill Unit: NW4 |
| | |
Wellbore Completed | Completion Date: | 9/30/1999 | Spud Date: | 8/24/1999 | Spud Date Is: | ACTUAL | Measured TD: | 4010 ft. | Measured PB depth: | 3961 ft. | True Vertical TD: | 4010 ft. | True Vertical PB depth: | 3961 ft. | Log Types: | CCL/GR/NL | Log Types: | CCL/GR/NL | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 417 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: , Bottom: 4177 ft., Determination Method: | Casing: | String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 4008 ft., Weight: 15.5 , Citings Type: ACTUAL | Cement: | Sacks: 900, Top: , Bottom: 4008 ft., Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | FRUITLAND | 3564 ft. | 3936 ft. | N | N |
Formation FRLDC Formation Classification: GW Status: PR - 4/1/2020 Interval Top: 3593 ft. Interval Bottom: 3909 ft. Completed Information for Formation FRUITLAND COAL | 1st Production Date: | 12/8/1999 | Choke Size: | 0.750 in. | Formation Name: | FRUITLAND COAL | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 9/30/1999 | Treatment Summary: | TREATED W/1000 GAL 10% FORMIC ACID FOLLOWED W/150792 GAL DELTA FRAC 140 GEL W/SAND WEDGE CONTAINING 3060 SX 20/40 SD. |
| Tubing Size: | 2.375 in. | Tubing Setting Depth: | 3570 ft. | Tubing Packer Depth: | 3537 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 10/3/1999 | Test Method: | FLOWING | Hours Tested: | 24 | Gas Type: | COAL GAS | Gas Disposal: | VENTED | |
Test Type | Measure |
---|
BBLS_H2O | 248 | BBLS_OIL | 0 | CALC_BBLS_H2O | 248 | CALC_BBLS_OIL | 0 | CALC_MCF_GAS | 1040 | MCF_GAS | 1040 | TUBING_PRESS | 58 |
| Perforation Data: | Interval Top: | 3593 ft. | # Of Holes: | 268 | Interval Bottom: | 3909 ft. | Hole Size: | 0.45 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 69051 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 32.522 |
Average MCFE per Day | 188.636 |
Federal Financial Assurance | i | |
|
|