Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-067-06615
Well Classification: CBM Status: PR - 1/19/2022
Well Name/No:LEMON K #1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SIMCOE LLC - 10749
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:18114
Facility Status:PRStatus Date1/19/2022
FacilityID:215010LocationID:334190
County:LA PLATA #067Location:NWNE 18 34N8W M
Field:IGNACIO BLANCO - #38300Elevation:6768 ft.
Basin:SAN JUAN BASIN  
Planned Location:1251FNL  1587 FELLat/Long: 37.194937 / -107.755575Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 37.194755 / -107.755446Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: CBM             Status: PR - 1/19/2022             Measured TD: 2710 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: CBM        PR - 1/19/2022
Wellbore Permit
Permit #:821129 Expiration Date:11/5/1982
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: FRLDC , Formation: FRUITLAND COAL , Order: 0 , Unit Acreage: 160, Drill Unit: NE4

Wellbore Completed
Completion Date:2/5/1986
Spud Date:9/4/1982Spud Date Is:ACTUAL
Measured TD:2710 ft.Measured PB depth:2442 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 545 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 200, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 6.75 in., Size: 5.5 in., Top: 0 ft., Depth: 2710 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
FRUITLAND2203 ft.
PICTURED CLIFFS2486 ft.

Formation FRLDC                   Formation Classification:  CBM                   Status:  PR - 1/19/2022                 Interval Top: 2257 ft.    Interval Bottom: 2632 ft.

 Completed Information for Formation FRUITLAND COAL
1st Production Date:2/15/1984Choke Size: 
Formation Name:FRUITLAND COALCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/17/2022Treatment End Date:1/18/2022
Treatment Summary:1/17/2022: SET TUBING ABOVE PERFS AT. PUMP 1000 GAL (23.8 BBL) INHIBITED 15% HCL, 5 GAL SURFACTANT, SOAK 1 HOUR. MAX PRESSURE OBSERVED DURING TREATMENT 0 PSI; WELL WENT ON VACUUM DURING PUMPING OPERATIONS AT 20 GALLONS TOTAL FLUID PUMPED. PUMP 15 BBL NEUTRALIZATION SLURRY (15 BBL 0.5% KCL W/ 2 GPT BIOCIDE AND 600# SODA ASH), SOAK OVERNIGHT. 1/18/2022: LAND TUBING, RUN PUMP/RODS, OPERATIONS STARTUP ARTIFICIAL LIFT, RETURNED WELL TO SERVICE.
Total fluid used in treatment (bbls):39Max pressure during treatment (psi):0
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):15Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation FRLDC.
Perforation Data:
Interval Top:2257 ft.# Of Holes:311
Interval Bottom:2632 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)63434
GOR
GOR DeterminationMCFE
Average BOE per Day29.967
Average MCFE per Day173.820

 Federal Financial Assurance  i 

 Tribal Well  i No