|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 1/19/2022 Measured TD: 2710 ft. Vertical TD: 0 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 1/19/2022 | | Wellbore Permit | | | Permit #: | 821129 | Expiration Date: | 11/5/1982 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 0 , Unit Acreage: 160, Drill Unit: NE4 |
| | |
| Wellbore Completed | | Completion Date: | 2/5/1986 | | Spud Date: | 9/4/1982 | Spud Date Is: | ACTUAL | | Measured TD: | 2710 ft. | Measured PB depth: | 2442 ft. | | True Vertical TD: | 0 ft. | True Vertical PB depth: | | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 545 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 200, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 2ND, Hole Size: 6.75 in., Size: 5.5 in., Top: 0 ft., Depth: 2710 ft., Weight: , Citings Type: HISTORICAL | | Cement: | Sacks: 0, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FRUITLAND | 2203 ft. | | | | | PICTURED CLIFFS | 2486 ft. | | | |
Formation FRLDC Formation Classification: CBM Status: PR - 1/19/2022 Interval Top: 2257 ft. Interval Bottom: 2632 ft.| Completed Information for Formation FRUITLAND COAL | | 1st Production Date: | 2/15/1984 | Choke Size: | | | Formation Name: | FRUITLAND COAL | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 1/17/2022 | Treatment End Date: | 1/18/2022 | | Treatment Summary: | 1/17/2022: SET TUBING ABOVE PERFS AT. PUMP 1000 GAL (23.8 BBL) INHIBITED 15% HCL, 5 GAL SURFACTANT, SOAK 1 HOUR. MAX PRESSURE OBSERVED DURING TREATMENT 0 PSI; WELL WENT ON VACUUM DURING PUMPING OPERATIONS AT 20 GALLONS TOTAL FLUID PUMPED. PUMP 15 BBL NEUTRALIZATION SLURRY (15 BBL 0.5% KCL W/ 2 GPT BIOCIDE AND 600# SODA ASH), SOAK OVERNIGHT. 1/18/2022: LAND TUBING, RUN PUMP/RODS, OPERATIONS STARTUP ARTIFICIAL LIFT, RETURNED WELL TO SERVICE.
| | Total fluid used in treatment (bbls): | 39 | Max pressure during treatment (psi): | 0 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 | | Fresh water used in treatment (bbls): | 15 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation FRLDC. |
| | Perforation Data: | | Interval Top: | 2257 ft. | # Of Holes: | 311 | | Interval Bottom: | 2632 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 63434 |
| GOR | |
| GOR Determination | MCFE |
| Average BOE per Day | 29.967 |
| Average MCFE per Day | 173.820 |
| Federal Financial Assurance | i | |
|
|