|
|
|
|
Wellbore #00 Wellbore Classification: CBM Status: PR - 5/12/2022 Measured TD: 8148 ft. Wellbore Data for Original Wellbore | Wellbore Classification: CBM PR - 5/12/2022 | Wellbore Permit | | Permit #: | 19791117 | Expiration Date: | 5/22/2002 | Prop Depth/Form: | 2936 ft. | Surface Mineral Owner Same: | No | Mineral Owner: | FEE | Surface Owner: | FEE | Unit: | | Unit Number: | | Formation And Spacing: | Code: DKTA , Formation: DAKOTA , Order: 112 , Unit Acreage: 640, Drill Unit: ALL | Formation And Spacing: | Code: FRLDC , Formation: FRUITLAND COAL , Order: 112-157 , Unit Acreage: 320, Drill Unit: N2 | Formation And Spacing: | Code: MVRD , Formation: MESAVERDE , Order: 112 , Unit Acreage: 320, Drill Unit: N2 | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 314 ft., Weight: 36 , Citings Type: PLANNED | Cement: | Sacks: 300, Top: 0 ft., Bottom: 314 ft. | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 3625 ft., Weight: 23 , Citings Type: PLANNED | Cement: | Sacks: 560, Top: 0 ft., Bottom: 3625 ft. | Casing: | String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 8148 ft., Weight: 10.5 , Citings Type: PLANNED | Cement: | Sacks: 500, Top: 0 ft., Bottom: 8148 ft. |
| | |
Wellbore Completed | Completion Date: | 1/27/1980 | Spud Date: | 10/27/1979 | Spud Date Is: | ACTUAL | Measured TD: | 8148 ft. | Measured PB depth: | 8103 ft. | True Vertical TD: | | True Vertical PB depth: | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: , Depth: 314 ft., Weight: 32.3 , Citings Type: ACTUAL | Cement: | Sacks: 300, Top: , Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: , Depth: 3625 ft., Weight: 20 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Casing: | String Type: 2ND, Hole Size: 6.25 in., Size: 4.5 in., Top: , Depth: 8148 ft., Weight: 11.6 , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | PICTURED CLIFFS | 3172 ft. | | | | LEWIS | 3404 ft. | | | | MESAVERDE | 5512 ft. | | | | MANCOS | 5814 ft. | | | | DAKOTA | 7900 ft. | | | |
Formation DKTA Formation Classification: CBM Status: AB - 10/1/1993 Interval Top: 7928 ft. Interval Bottom: 8050 ft. Completed Information for Formation DAKOTA | 1st Production Date: | N/A | Choke Size: | 0.750 in. | Formation Name: | DAKOTA | Commingled: | No | Production Method: | FLOWING | Open Hole Completion: | No |
| Formation Treatment | Treatment Date: | 1/27/1980 | Treatment Summary: | |
| Tubing Size: | 2.0625 in. | Tubing Setting Depth: | 8050 ft. | Tubing Packer Depth: | 7956 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 4/1/1980 | Test Method: | FLOWING | Hours Tested: | 3 | Gas Type: | | Gas Disposal: | SOLD | |
Test Type | Measure |
---|
CALC_MCF_GAS | 2032 | CASING_PRESS | 162 | MCF_GAS | 254 | TUBING_PRESS | 162 |
| Perforation Data: | Interval Top: | 7928 ft. | # Of Holes: | 114 | Interval Bottom: | 8050 ft. | Hole Size: | |
|
Formation MVRD Formation Classification: CBM Status: AB - 11/26/2012 Interval Top: 5670 ft. Interval Bottom: 5714 ft. Completed Information for Formation MESAVERDE | 1st Production Date: | N/A | Choke Size: | | Formation Name: | MESAVERDE | Commingled: | No | Production Method: | | Open Hole Completion: | |
| Formation Treatment | Treatment Date: | 1/27/1980 | Treatment Summary: | NO NEW TREATMENT ZONE DUAL COMPLETED W/ FRUITLAND COAL |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | N/A | Test Method: | | Hours Tested: | | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
MCF_GAS | 2032 |
| Perforation Data: | Interval Top: | 5670 ft. | # Of Holes: | 52 | Interval Bottom: | 5714 ft. | Hole Size: | |
|
Formation FRLDC Formation Classification: CBM Status: PR - 5/12/2022 Interval Top: 2890 ft. Interval Bottom: 3170 ft. Completed Information for Formation FRUITLAND COAL | 1st Production Date: | 8/11/1980 | Choke Size: | | Formation Name: | FRUITLAND COAL | Commingled: | No | Production Method: | | Open Hole Completion: | No |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 5/9/2022 | Treatment End Date: | 5/10/2022 | Treatment Summary: | 5/09/2022: PUMP 1000 GAL (23.8 BBL) 15% HCL W/ ADDITIVES DOWN CASING X TUBING ANNULUS, 5 BBL FLUSH (0.5% KCL W/ 2 GPT BIOCIDE AND 1 GPT SURFACTANT), SOAK 1 HOUR. MAX PRESSURE OBSERVED DURING TREATMENT 52 PSI; WELL WENT ON VACUUM DURING PUMPING OPERATIONS AT 7 BBLS TOTAL FLUID PUMPED. PUMP 15 BBL NEUTRALIZATION SLURRY (15 BBL 0.5% KCL W/ 2 GPT BIOCIDE AND 600# SODA ASH), 5 BBL FLUSH, SOAK OVERNIGHT. 5/10/2022: OPERATIONS STARTUP ARTIFICIAL LIFT, RETURNED WELL TO SERVICE.
| Total fluid used in treatment (bbls): | 49 | Max pressure during treatment (psi): | 52 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 0 | Fresh water used in treatment (bbls): | 25 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | | Treatment Date: | 8/26/2014 | Treatment End Date: | N/A | Treatment Summary: | 3/19/2014: Perf'd the Fruitland Coal formation, 7 intervals from 2,890'-2900', 2936'-2938', 2996'-3010', 3030'-3036', 3072'-3084', 3135'-3139', 3166'-3,170'; 208 shots; .49" in diameter | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 1/27/1980 | Treatment Summary: | FRACED W/79423 GALS, 144941#SD, AIR 28.2 BPM @ 2339#, ISIP 2939# DUAL COMPLETED W/MVRD |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation FRLDC. |
| Perforation Data: | Interval Top: | 2890 ft. | # Of Holes: | 443 | Interval Bottom: | 3170 ft. | Hole Size: | 0.4 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 98506 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 46.411 |
Average MCFE per Day | 269.166 |
Federal Financial Assurance | i | |
|
|