|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 11/30/2022 Measured TD: 18880 ft. Vertical TD: 7130 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 11/30/2022 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/7/2025 | | Proposed Top PZ Location: | Sec:5 Twp: 6N 80W | Footage: 127 FNL 995 FWL | | Bottom Hole Location: | Sec:17 Twp: 6N 80W | Footage: 2669 FNL 1010 FWL | | Proposed Depth/Form: | 20627 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Surprise Unit | Unit Number: | COC 075017X | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 531-66 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 8, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2400 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 605, Top: 0 ft., Bottom: 2400 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 20627 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3648, Top: 0 ft., Bottom: 20627 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/4/2022 | | Spud Date: | 6/16/2022 | Spud Date Is: | ACTUAL | | Measured TD: | 18880 ft. | Measured PB depth: | 18815 ft. | | True Vertical TD: | 7130 ft. | True Vertical PB depth: | 7128 ft. | | Top PZ Location: | Sec:5 Twp: 06N 80W | Footage: 1975 FNL 957 FWL | | Bottom Hole Location: | Sec:17 Twp: 06N 80W | Footage: 1797 FNL 1000 FWL | | Log Types: | RCBL, MWD
(Triple combination run on API: 057-06467)
| | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 75 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: 0 ft., Bottom: 90 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2404 ft., Weight: 40 , Citings Type: ACTUAL | | Cement: | Sacks: 745, Top: 0 ft., Bottom: 2404 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 18860 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 3135, Top: 3204 ft., Bottom: 18860 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | PIERRE | 4054 ft. | | N | N | | SUSSEX | 4853 ft. | | N | N | | SHANNON | 5465 ft. | | N | N | | NIOBRARA | 7738 ft. | | N | N |
Formation NBRR Formation Classification: OW Status: PR - 11/30/2022 Interval Top: 8243 ft. Interval Bottom: 18768 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 11/24/2022 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | HYDRAULIC FRACTURING | | Treatment Date: | 10/2/2022 | Treatment End Date: | 10/28/2022 | | Treatment Summary: | 53,172 gal 15% HCl, 16,838,373 gal slickwater, 2,905,151 gal Hybor G25#, treated water 750,078 & 10,974,109 lbs 30/50 Premium white sand | | Total fluid used in treatment (bbls): | 20546774 | Max pressure during treatment (psi): | 9796 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 48 | | Total acid used in treatment (bbls): | 53172 | Min frac gradient (psi/ft): | 0.76 | | Recycled water used in treatment (bbls): | 16838373 | Total flowback volume recovered (bbls): | 12311 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 10974109 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 7818 ft. | | Tubing Packer Depth: | 7820 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/30/2022 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 455 | | BBLS_OIL | 346 | | BTU_GAS | 1346 | | CALC_BBLS_H2O | 455 | | CALC_BBLS_OIL | 346 | | CALC_GOR | 662 | | CALC_MCF_GAS | 229 | | CASING_PRESS | 2100 | | GRAVITY_OIL | 38 | | MCF_GAS | 229 | | TUBING_PRESS | 1667 |
| | Perforation Data: | | Interval Top: | 8243 ft. | # Of Holes: | 2592 | | Interval Bottom: | 18768 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 53489 |
| Total Gas Produced (MCF) | 136814 |
| GOR | 2557 |
| GOR Determination | BOE |
| Average BOE per Day | 211.378 |
| Average MCFE per Day | 1225.967 |
| Federal Financial Assurance | i | Y |
|
|