|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: AB - 10/10/2017 Measured TD: 7010 ft. Vertical TD: 7008 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW AB - 10/10/2017 | | Wellbore Permit | VERTICAL | | Permit #: | | Expiration Date: | 2/15/2019 | | Proposed Top PZ Location: | Sec:23 Twp: 6N 81W | Footage: 1728 FNL 2182 FWL | | Bottom Hole Location: | Sec:23 Twp: 6N 81W | Footage: 1728 FNL 2182 FWL | | Proposed Depth/Form: | 8500 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Rabbit Ears | Unit Number: | COC78026X | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 63, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 422, Top: 0 ft., Bottom: 1800 ft. | | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 2400 ft., Depth: 8650 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: |
| | |
| Wellbore Completed | | Completion Date: | 10/12/2017 | | Spud Date: | 10/11/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 7010 ft. | Measured PB depth: | 1928 ft. | | True Vertical TD: | 7008 ft. | True Vertical PB depth: | 1928 ft. | | Bottom Hole Location: | Sec:23 Twp: 6N 81W | Footage: 1728 FNL 2182 FWL | | Log Types: | Mud, MWD, Quad Combo | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 12.25 in., Top: 0 ft., Depth: 115 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 115 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1805 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 455, Top: 0 ft., Bottom: 1805 ft., Determination Method: VISU | | Casing: | String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 1805 ft., Depth: 7010 ft., Weight: , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 6504 ft., Depth: , Bottom: 6780 ft., Sacks: 100, Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 5949 ft., Depth: , Bottom: 6225 ft., Sacks: 100, Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 5507 ft., Depth: , Bottom: 5783 ft., Sacks: 100, Method: | | Additional Cement: | String Type: OPEN HOLE , Top: 1928 ft., Depth: , Bottom: 2600 ft., Sacks: 285, Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 2372 ft. | | | | | PIERRE | 2671 ft. | | | | | SUSSEX | 3303 ft. | | | | | SHANNON | 3679 ft. | | | | | MANCOS | 4824 ft. | | | | | NIOBRARA | 5137 ft. | | | | | CARLILE | 5597 ft. | | | | | FRONTIER | 5783 ft. | | | | | GRANEROS | 5946 ft. | | | | | MOWRY | 6118 ft. | | | | | DAKOTA | 6225 ft. | | | | | MORRISON | 6380 ft. | | | | | ENTRADA | 6781 ft. | | | | | No formation data to display. |
Sidetrack #01 Wellbore Classification: OW Status: TA - 10/1/2025 Measured TD: 21876 ft. Vertical TD: 5455 ft.| Wellbore Data for Sidetrack #01 | Wellbore Classification: OW TA - 10/1/2025 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 3/16/2019 | | Proposed Top PZ Location: | Sec:23 Twp: 6N 81W | Footage: 2181 FNL 1226 FWL | | Bottom Hole Location: | Sec:2 Twp: 5N 81W | Footage: 1802 FNL 1723 FWL | | Proposed Depth/Form: | 16521 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | Rabbit Ears | Unit Number: | COC78026X | | Formation And Spacing: | Code: NBRR , Formation: NIOBRARA , Order: 531-40 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 90 ft., Weight: 65 , Citings Type: PLANNED | | Cement: | Sacks: 63, Top: 0 ft., Bottom: 90 ft. | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1800 ft., Weight: 36 , Citings Type: PLANNED | | Cement: | Sacks: 442, Top: 0 ft., Bottom: 1800 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 21937 ft., Weight: 20 , Citings Type: PLANNED | | Cement: | Sacks: 3912, Top: , Bottom: 21937 ft. |
| | |
| Wellbore Completed | | Completion Date: | 11/1/2017 | | Spud Date: | 10/11/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 21876 ft. | Measured PB depth: | 21870 ft. | | True Vertical TD: | 5455 ft. | True Vertical PB depth: | 5455 ft. | | Top PZ Location: | Sec:23 Twp: 6N 81W | Footage: 2181 FNL 1226 FWL | | Bottom Hole Location: | Sec:2 Twp: 6N 81W | Footage: 1802 FNL 1723 FWL | | Log Types: | Mud, MWD/LWD, CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 115 ft., Weight: 94 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 115 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 1805 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 455, Top: 0 ft., Bottom: 1805 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 5.5 in., Top: 0 ft., Depth: 21876 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: 4275, Top: 4790 ft., Bottom: 21876 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | FOX HILLS | 2370 ft. | | | | | PIERRE | 2667 ft. | | | | | SUSSEX | 3302 ft. | | | | | SHANNON | 3687 ft. | | | | | MANCOS | 4914 ft. | | | | | NIOBRARA | 5291 ft. | | | |
Formation NBRR Formation Classification: OW Status: TA - 10/1/2025 Interval Top: 6190 ft. Interval Bottom: 21639 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 12/19/2017 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/13/2017 | Treatment End Date: | 11/26/2017 | | Treatment Summary: | Plug and Perf Completion: Contained 60 stages, all stimulated with water, acid, and proppant. 1440 bbls of 15% NEFE HCL Acid, 304,999 bbls of total freshwater, and 1,679,743 lbs of 40/70 proppant and 13,802,383 lbs of 20/40 proppant.
| | Total fluid used in treatment (bbls): | 306439 | Max pressure during treatment (psi): | 8682 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.34 | | Type Of gas: | | Number Of staged intervals: | 60 | | Total acid used in treatment (bbls): | 1440 | Min frac gradient (psi/ft): | 0.77 | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 75858 | | Fresh water used in treatment (bbls): | 304999 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 15482126 | Green completions techniques utilized: | No | | Reason green techniques Not utilized: PIPELINE |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 4952 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/15/2018 | Test Method: | | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | FLARED | |
| Test Type | Measure |
|---|
| BBLS_H2O | 1936 | | BBLS_OIL | 377 | | BTU_GAS | 1420 | | CALC_BBLS_H2O | 1936 | | CALC_BBLS_OIL | 377 | | CALC_GOR | 98 | | CALC_MCF_GAS | 37 | | CASING_PRESS | 48 | | GRAVITY_OIL | 38 | | MCF_GAS | 37 | | TUBING_PRESS | 320 |
| | Perforation Data: | | Interval Top: | 6190 ft. | # Of Holes: | 1800 | | Interval Bottom: | 21639 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | Y | Noticed Date 07/01/2025 |
| Defined Inactive (TA) | Y | Last Production 07/17/2025 |
| Low Producing | Y | Production Period 01/2025 - 12/2025 |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|