Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-057-06562
Well Classification: DSPW Status: IJ - 9/1/2025
Well Name/No:Pintail SWD 0780 #1-16D
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:FULCRUM ENERGY OPERATING LLC - 10805
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:IJStatus Date9/1/2025
FacilityID:446806LocationID:446527
County:JACKSON #057Location:SESW 16 7N80W 6
Field:WILDCAT - #99999Elevation:8139 ft.
Basin:NORTH PARK BASIN  
Planned Location:1296FSL  1632 FWLLat/Long: 40.573810 / -106.382210Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.573810 / -106.382210Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/29/2018
End Date: 9/29/2018
Reported: 10/25/2018
Days to report: 26
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 9/1/2025             Measured TD: 10535 ft.    Vertical TD: 9376 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 9/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/19/2021
Proposed Top PZ Location:Sec:16 Twp: 7N 80W Footage: 365 FNL  1861 FWL
Bottom Hole Location:Sec:16 Twp: 7N 80W Footage: 228 FNL  1869 FWL
Proposed Depth/Form:10535 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: DKTA , Formation: DAKOTA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: ENRD , Formation: ENTRADA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: LKTA , Formation: LAKOTA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: 531-23 , Unit Acreage: 1280, Drill Unit: Sec. 16 & 21: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 51 ft., Weight: 106.5 , Citings Type: PLANNED
Cement:Sacks: 0, Top: 0 ft., Bottom: 51 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2314 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 585, Top: 0 ft., Bottom: 2314 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 10535 ft., Weight: 26 , Citings Type: PLANNED
Cement:Sacks: 1030, Top: 0 ft., Bottom: 10535 ft.

Wellbore Completed
Completion Date:1/2/2018
Spud Date:8/26/2016Spud Date Is:ACTUAL
Measured TD:10535 ft.Measured PB depth:10497 ft.
True Vertical TD:9376 ft.True Vertical PB depth:9376 ft.
Top PZ Location:Sec:16 Twp: 7N 80WFootage: 365 FNL  1861 FWL
Bottom Hole Location:Sec:16 Twp: 7N 80WFootage: 228 FNL  1869 FWL
Log Types:
Log Types:Triple Combo, Mud, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 51 ft., Weight: 106.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 51 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 2314 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 585, Top: 0 ft., Bottom: 2314 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 10535 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 1030, Top: 0 ft., Bottom: 10535 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
PIERRE4404 ft.
SUSSEX5557 ft.
SHANNON6339 ft.
MANCOS7774 ft.
NIOBRARA8130 ft.NN
CARLILE8672 ft.NN
FRONTIER8959 ft.NN
GRANEROS9160 ft.NN
DAKOTA9541 ft.NN
LAKOTA9696 ft.
MORRISON9752 ft.NN
ENTRADA10200 ft.NN
CHUGWATER10370 ft.NN

Formation ENRD                     Formation Classification:  DSPW                     Status:  IJ - 9/1/2025                  Interval Top: 10202 ft.    Interval Bottom: 10368 ft.

 Completed Information for Formation ENTRADA
1st Production Date:2/26/2019Choke Size: 
Formation Name:ENTRADACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/29/2018Treatment End Date:9/29/2018
Treatment Summary:36 bbls 15% NEFE HCL acid and 2037 bbls total crosslink water used and 118,700 lbs total 20/40 sand.
Total fluid used in treatment (bbls):2037Max pressure during treatment (psi):4643
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.33
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):0
Fresh water used in treatment (bbls):2001Disposition method For flowback:
Total proppant used (lbs):118700Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/15/2018Treatment End Date:2/16/2018
Treatment Summary:The acid treatment contained 1 stage, all stimulated with water and acid. 571 bbls of 15% NEFE HCL acid and 2106 bbls of fluid.
Total fluid used in treatment (bbls):2106Max pressure during treatment (psi):3943
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.34
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):571Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):573
Fresh water used in treatment (bbls):1533Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation ENRD.
Perforation Data:
Interval Top:10202 ft.# Of Holes:640
Interval Bottom:10368 ft.Hole Size:0.56 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No